Energy Storage System for Utilities - Energy - Energy Utilities
8minute has established a reputation as a trusted partner with both utilities and communities alike.
Details
THE FOUR LARGEST UTILITIES, COVERING 80% OF THE CALIFORNIA POWER MARKET, HAVE ALL EXECUTED PPAS WITH 8MINUTE AND ARE REPEAT CUSTOMERS.
8minute’s unique model for solar infrastructure with a focus on design optimization achieves industry-leading Levelized Cost of Energy (LCOE). A continuous process of system analysis, attention to performance details, driving down costs, and matching the design to the characteristics of the site, produces the optimum solution for each project.
8minute does not have a financial stake in the production of PV equipment, which allows the company to select and deploy the best technology for each project. Additionally, 8minute only develops solar power and battery storage projects, thus eliminating the possibility of price and production conflicts with alternative types of projects.
Eland Solar & Storage Center
Eland Solar & Storage Center is the lowest-cost solar and energy storage project in the country. Designed to deliver clean energy both day and night, Eland will strengthen grid operations for the Los Angeles Department of Water and Power (LADWP) and deliver low-cost energy to nearly one million people in the Cities of Los Angeles and Glendale.
- Status: Under Development
- Capacity: 400 MWac with 1,200 MWh of storage
- Offtakers: Los Angeles Department of Water and Power (LADWP)