Antero Resources Corporation, Compressor Station
Environmental Noise Control was commissioned to provide a noise study for an Antero Resources Corporation compressor station in Colorado, USA. The assessment used acoustic computer modeling to determine noise compliance within the Federal Energy Regulatory Commission (FERC) limits.
The compressor station consisted of several compressors and vertical coolers housed in a compressor building. ENC’s acoustic computer noise modeling showed that the compressor building would require noise mitigation to reduce noise levels to those Clomid clomiphene citrate buy within FERC regulations.
Using the computer noise model and report, ENC could design a complete noise mitigation plan that ensured FERC noise requirement compliance, saving time and costs associated with installing “off-the-shelf” materials that may not have had as significant an effect on the compressor noise.
The mitigation modeled and implemented on the compressor station included ENC silencer banks on the cooling towers and ENC’s permanent industrial acoustical walls.
-
Most popular related searches
Customer comments
No comments were found for Antero Resources Corporation, Compressor Station. Be the first to comment!