Heating Plant Case Study
Courtesy of Aerovit A/S
Mounting of an AEROVIT system August 2005. Before the boiler had to be cleaned every 6. week The flue gas temperature was on a clean boiler 210°C The manual cleaning was executed by 250°C. Evaluation of the AEROVIT systems effect From 28 Nov. 2005 to 28 April the boiler is running full load In that period the flue gas temperature increased by 30°C Without AEROVIT: Manual cleaning 6 times/year With AEROVIT: Manual cleaning 1 time/year.
Details
With 1% savings on fuel consumption and increased boiler efficiency and with 60% fewer manual cleanings the result will be:
- The investment DKK 273.000 is paid back after 16 months
- Rate of return/year at average: 77 %
-
Most popular related searches