archimedes hydropower turbine Articles

  • Windsor Castle (UK) - Case Study

    Early September 2011 two 40-ton Archimedes hydropower screw turbines were transported from Sneek, The Netherlands to the royal Windsor Castle, UK. Both screws are installed at Romney weir on the River Thames and power both the Royal Castle as well as 400 - 500 local households. The Landy screws dimension 4 meter diameter, 6 meter long and capacity 150 kW. Unique feature of each ...


    By Landustrie Sneek BV

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you