archimedes screw turbine Articles

  • Penllergare (WAL) - Case Study

    A 40 ft LANDY Archimedes screw turbine has been installed next to the waterfall at Penllergare Valley Woods. This screw with a length of 11 m will generate power for the new visitor centre at the estate, while surplus will be fed to the national grid. The screw is featured by its high efficiency and fish friendliness. Capacity 2880 m3/h Location: Penllergare, Wales, UK ...


    By Landustrie Sneek BV

  • Windsor Castle (UK) - Case Study

    Early September 2011 two 40-ton Archimedes hydropower screw turbines were transported from Sneek, The Netherlands to the royal Windsor Castle, UK. Both screws are installed at Romney weir on the River Thames and power both the Royal Castle as well as 400 - 500 local households. The Landy screws dimension 4 meter diameter, 6 meter long and capacity 150 kW. Unique feature of each ...


    By Landustrie Sneek BV

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you