boiler house Articles

  • Saving waste in the boiler house

    Burner technology has improved greatly in recent years. Older Burners had a series of cams and levers that were calibrated to provide specific amounts of air for a particular rate of firing. Being mechanical items, these wore and sometimes required calibration. They, therefore, had to be regularly serviced and calibrated. Generally, new burners use frequency controlled motors and cams to open air ...


    By EBE Engineering Ltd.

  • Monitoring flammable gas in boiler houses

    The most common fuels in use for space and water heating are Oil, Natural Gas and Liquid Petroleum Gas (LPG). By far the most popular, clean and cost effective solutions are utilising Natural Gas or LPG. The traditional safety measure derived from the time of oil fired boiler houses is the use of a fusible link placed above the each boiler. The fusible link is intended to melt if it becomes ...

  • Unity – Intelligent boiler house control case study

    Achieve efficient and cost-effective management of multiple boiler house systems with UNITY from Byworth – the next-generation of control interfaces. Offering unprecedented levels of visibility and fingertip control of every aspect of boiler house technology, UNITY was conceived and created by a team headed by Jason Atkinson; runner-up Electrical Apprentice of the Year and ...


    By Byworth Boilers

  • Lister housing cooperative - condensing boiler case study

    Customer: Lister Housing Cooperative Location: Lauriston Place, Edinburgh Heating System: New Vaillant Condensing System Boiler Installed: 02/09 The property is a two bedroom flat in a Georgian terrace with high ceilings and hard to heat. Before hand the flat was not heated properly even after ...


    By Vortex Energy Saver

  • Lister housing cooperative - non condensing boiler case study

    Customer: Lister Housing Cooperative Location: Lauriston Place, Edinburgh Heating System: Potterton Suprima 24KW Non Condensing Boilerinstalled in 1991. Installed: 02/09 Lister Housing Association carried out a trial on Vortex. The property is a 6 bed 3 storey Georgian terrace with high ...


    By Vortex Energy Saver

  • Eco House, Lanarkshire

    A Gaia-Wind turbine is the principal wind energy source in this eco house in Scotland. The house is all electric, consuming 50% of produced energy, and offsets 16 tonnes of CO2 annually. Average annual energy production: 28,000 kWh Background Mr Taylor is an architect by profession. He designed his own eco house incorporating a Gaia-Wind turbine as the principal wind ...


    By Gaia-Wind Ltd.

  • Social housing retrofit - a rural innovation for the future project

    The client for this project was Warwick District Council and the aim was to deliver deep cuts in carbon emissions and primary energy demands for two social houses in a rural location in Warwickshire. Encraft won the funding for this project from the Technology Strategy Board as part of the Retrofit for the Future competition. Encraft project managed and designed the retrofit project and came up ...


    By Encraft Ltd

  • Norwich - open vent boiler case study

    Customer: Malcolm Robinson Location: Norwich, Norfolk Heating System: Open Vent Glow Worm 85-100 Boiler Installed: 11/09 This is a spacious four bedroom detached house, which was built in 1979. The owner installed a Vortex in November 2009 and compared his energy bills from winter 2008-2009 (pre Vortex) against winter 2009-2010 (with Vortex). The heating for ...


    By Vortex Energy Saver

  • Whitly Bay - Gas Fired Boiler case study

    Customer: J.P. Westall, Hexham Location: Whitely Bay Heating System: Gas fired, with 15 radiators Installed: 06/07 System problems The heating system in question is a gas fired system with problems of banging and rattling. Half the radiators were not heating properly and ...


    By Vortex Energy Saver

  • Case study - Be modern invest in biomass boilers

    As one of the UK’s largest fireplace manufacturers and suppliers of bathroom furniture, Be Modern is an established Group of Companies based in the North East that employs over 350 skilled workers. Established in 1964 the group supplies products across the UK to a wide and diverse customer base as well as exporting products across Europe. With over 500,000 square foot of manufacturing ...


    By Mawera (UK) Ltd

  • oil fired boiler price in South Africa

    oil fired boiler price in South Africa  ...


  • How to prolong the service life of biomass fired boiler

    Because of the shortage of energy and environmental deterioration caused by the extensive use of fossil fuel,biomass fired boiler has played a more and more important role in the industrial boilers.Therefore,we need to focus on the following aspects of work to ensure its normal operation and prolong its service life: ...

  • Heather glen country house hotel – renewable energy advice case study

    Background Heather Glen Country House Hotel in Cumbria was undertaking a major extension and alterations to the premises and sought advice from Envirolink Northwest on how to make energy improvements. Envirolink Northwest recommended a switch from LPG to a renewable biomass fuel, which was followed by assistance with an application for a local grant to help with the cost. The grant was ...


    By Envirolink Northwest

  • Environmentally Sustainable Design Building in York - Biomass Boiler case study

    This is an architectural practice that specialises in environmentally sustainable design for existing and new build projects. The practice is run by the husband and wife team of Sally and Chris Walker who recently took the step of building a dedicated office adjacent to their house to accommodate the expanding business and designing it to have as small a carbon footprint as possible. The office ...


    By Vortex Energy Saver

  • How to Get the Most Out of Your Boiler MACT Energy Assessment

    Congratulations!  You’ve made it through the first year of planning for compliance with the Major and Area Source Boiler MACT rules.  That means there are two years left for major sources to come into compliance by January 31, 2016 (or January 31, 2017 for those who requested and received a one-year extension), and just ...


    By All4 Inc.

  • Hurricane HR System to Reduce Particulate Matter from a Biomass Boiler Burning Pellets Under 50mg/Nm3 - Case Study

    Foreword Advanced Cyclone Systems, S.A. (ACS) designed and supplied a Hurricane Cyclone System for Norbidel, a Portuguese boiler manufacturer. End customer for boiler and Hurricane is Fepsa, a company that focuses its production on felts for hats. Its underlying processes involve compression and vibration, under the action of water and heat. Norbidel, based in Maia (Porto, Portugal) ...

  • Maxsys Fuel System generates 6% savings on Gas Fired Steam Raising Boilers at Mondi Packaging

    Mondi is one of the world’s leading international paper and packaging groups with a substantial global presence, employing 34,000 people at 112 sites across 34 different countries. The company is continually striving for a consistent high level of improvement in environmental performance in all its operations, making efficient use of raw materials and energy, while focusing on innovation ...


    By Maxsys Fuel Systems Ltd

  • Case Study - Helmsley Open Air Pool

    Helmsley Open Air Pool is operated by a registered charity – the Feversham Memorial Trust – and opens from June to September each summer. The 1930s pool is 25m in length and 10m wide. The existing heating system comprised an oil boiler working in tandem with an electric heat exchanger. During the 2007 season the oil boiler broke down and was in need of replacement. To keep the pool ...


    By LandEnergy Limited

  • Economics of tiny thermal power plants

    Thermal power plants is the main source of energy and electricity in India and almost all countries of the world. Most of the giant thermal power plants have capacity of 500MW to 1000 MW. Investment in such giant thermal power plants is Rs 100 million per MW including transmission lines and distribution lines. ( 60 rupees = 1 US$, MW=1000KW). So 1000MW thermal power plant costs Rs 100 million/MW ...


    By AADHUNIK GLOBAL ENERGY

  • Saint-Vincent Hospital, Ottawa, Ontario, Canada

    Boiler/Cogen Heat/Energy Recovery Application Thermal Energy installed designed and implemented an integrated FLU-ACE heat recovery system with cogeneration unit for efficient electrical power generation and an overall reduction in energy consumption. The installation consists of a natural gas fueled engine with a 425 kW generator, waste heat boiler, and FLU-ACE system processing combined flue ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you