burner unit Articles
-
The Nitrogen Experts - success factors
Employees Highly experienced: our employees average 14 years of nitrogen pumping services Equipment Incorporates the latest technology available Meets high standards of quality, maintained in-house Offers both heat recovery and burner units Management Committed to providing the best training possible Dedicated to the highest safety standards Responsive to industry changes ...
-
High Temperature Combustion of Biogas
High Temperature Combustion of Biogas Efficient combustion of biogas Controlled and concealed combustion Combustion temperature > 900°C Residence time more than 0.3 s Insulated combustion chamber High safety standard The HOFGAS® - IFL4c high temperature flare provides safe and environmentally-friendly combustion of biogas. The exhaust gas emissions meet the stringent requirements. ...
-
Akzo Nobel Contract Report Case Study
Akzo Nobel, a global paints and coatings manufacturer with operations in over 80 countries, were seeking sustainable methods of reducing their Slough production plant’s annual emissions, as well as its fuel and running ...
By Limpsfield
-
Drosrite extensive on-site hot dross treatment tests
DROSRITE is a salt-free process for the recovery of metal from dross. In addition to producing a salt-free residue, it does not produce any CO2 or NOx gases. The process is highly energy efficient, extracting heat from energy in the residue and, thus, it does not require an external heat source such as a plasma torch, an electric arc or a gas or oil burner. A DROSRITE pilot unit built by ...
-
Charles Darwin High School Contract Report Case Study
A no obligation survey was performed free of charge to determine how efficiently the plant was operating. A report was provided to the school outlining efficiency and emissions levels, highlighting where savings could be made and recommendations to achieve the savings. Based on the information collected during the survey, a quotation was prepared for the customer. This included the supply of 3 ...
By Limpsfield
-
Vattenfall`s Cogeneration Power Plant Reuter West - Case Study
The cogeneration power plant “Reuter West” was erected as a base load power plant in the vicinity of the existing “Reuter” plant. The two hard coal fired 300 MW units D and E were commissioned in 1987 and 1989. Today the cogeneration units supplying electricity and thermal energy are operated by Vattenfall Europe GmbH. The heart of each power plant is the boiler where the ...
-
5 Things to Remember When Buying a Mobile Biochar Unit
When you want to invest in a mobile biochar unit, it's important to do your due diligence and research all of the available options. Unfortunately, there is a lot of misinformation around that may easily lead you across the wrong path. To actually are generating a well informed purchase decision, here is what to be aware of when assessing potential units: 1. Research different types of mobile ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you