CBM wells Articles
1 articles found
-
Proppant flowback control in coal bed methane wells: experimental study and field application
Proppant flowback after fracturing coal bed methane (CBM) wells is a very common challenge which results in fracture pinching out, noticeable well productivity decrease, downhole and surface facility damage, etc. In this paper, fibre was studied as a low-cost and environmentally friendly additive to control proppant flowback in CBM well fracturing operation. Two kinds of glass fibre (short fibre ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you