Bucknell University - 6 MW CHP Application - Case Study
Quick Facts Location: Lewisburg, PA Campus Size: 450 acre campus with > 150 buildings, totaling 2.4 MM sq. ft. Student population over 3,300 Campus Loads: 42,000 MWh per yr 7.5 MW peak demand 70,000 lbs per hr steam Prime Movers: Solar Taurus 60 combustion turbine 70k lb/hr HRSG with redundancy Murray KG4 steam turbine Annual Energy Savings: $1.25 MM between 2003 and 2006 Installed System ...