Heavy media coal hydro-transport in Malinau, Indonesia: a process study
In Indonesia, coal transportation has traditionally been handled by trucks and by other mechanical means. With the expansion plan of coal production and increasing truck costs, Kayan Putra Utama Coal believes that alternative modes of transportation must be considered. For long distance transport of export size coal, one of the most viable options is to use coal slurry pipeline. This paper ...
-
Heavy media coal hydro-transport in Malinau, Indonesia: a process study
In Indonesia, coal transportation has traditionally been handled by trucks and by other mechanical means. With the expansion plan of coal production and increasing truck costs, Kayan Putra Utama Coal believes that alternative modes of transportation must be considered. For long distance transport of export size coal, one of the most viable options is to use coal slurry pipeline. This paper ...
-
Lanco Babandh Power Ltd - Case Study
Lanco Babandh Power is a coal fired thermal power project with two supercritical units of 660 MW each, located in Dhenkanal District, Orissa Total Capacity : 2x660 MW (1320 MW) Fuel Source : From Mahanadi Coalfields Ltd & Captive Coal Mine at Rampia Water Source : From River Brahmani Clearances : All Major clearances in place EPC Contractor : Lanco Infratech Limited Status BTG (Boiler, ...
By Lanco Group
-
AMETEK Land - World Coal - Beat the Heat
Between the time a piece of coal is dug out of the ground and is burned in a power plant boiler, it has been through many stages of transportation and storage. One of the advantages of coal as a fuel for power generation is the ability to store substantial quantities on site. This provides a strategic buffer of at least one month's fuel supply, which can be valuable if there is a short- or ...
-
Lanco Vidarbha Thermal Power Ltd - Case Study
Lanco Vidarbha Thermal Power is a coal fired thermal power project with two super critical units of 660 MW each, located near Mandva, Wardha District, Maharastra Total Capacity : 2x660 MW (1320 MW) Fuel Source : From South Eastern Coal Fields Water Source : From Lower Wardha reservoir Clearances : All major Clearances in place EPC Contractor : Lanco Infratech Limited Status BTG (Boiler, Turbine ...
By Lanco Group
-
Smith College Energy Center - 3.5-MW CHP Plant - Case Study
Quick Facts LOCATION: Northampton, MA FACILITY PEAK LOAD: 3.5 megawatts (MW) EQUIPMENT: 3.5 MW Solar Turbine, Rentech HRSG, package boiler and two York absorption chillers. FUEL: Natural Gas USE OF THERMAL ENERGY: Heating, cooling & hot water for the campus. USE OF ELECTRICAL ENERGY: Displaces campus loads previously supplied by the local utility. AVERAGE CAPACITY FACTOR: 75 % CHP IN ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you