Exergoeconomic evaluation of a geothermal power plant
In this study, exergy and exergoeconomic analyses of the Dora II geothermal power plant (DGPP) with 9.5 MW net power output are carried out by using real thermodynamic and cost data. The exergetic efficiency of this plant is calculated to be 29.6%. The highest exergy destruction rate among the DGPP components occurs in the cooling towers followed by the turbines, vaporisers, preheaters and pumps. ...