fly ash measurement Articles
-
Newbuild Power Station in Karlsruhe - Case Study
EnBW is one of the biggest German energy suppliers. A major new build bituminous coal fired power plant construction project is the new boiler number 8 of the Rheinhafen Dampfkraftwerk (RDK) in Karlsruhe. The new boiler will have a capacity of 912 MWel with a heating capacity of 220 MWth. The unit will be erected beside the existing units RDK4s and RDK7 and have a net efficiency of > 46% ...
-
An analysis of extinction coefficients of particles and water moisture in the stack after flue gas desulfurization at a coal-fired power plant
Two important factors that affect in-stack opacity—light extinction by emitted particles and that by water moisture after a flue gas desulfurization (FGD) unit—are investigated. The mass light extinction coefficients for particles and water moisture, kp and kw, respectively, were determined using the Lambert-Beer law of opacity with a nonlinear least-squares regression method. The ...
-
Vattenfall`s Cogeneration Power Plant Reuter West - Case Study
The cogeneration power plant “Reuter West” was erected as a base load power plant in the vicinity of the existing “Reuter” plant. The two hard coal fired 300 MW units D and E were commissioned in 1987 and 1989. Today the cogeneration units supplying electricity and thermal energy are operated by Vattenfall Europe GmbH. The heart of each power plant is the boiler where the ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you