North Carolina State University - 11 MW CHP & District Energy System - Case Study
Quick Facts LOCATION: Raleigh, North Carolina MARKET SECTOR: University IN OPERATION SINCE: 2012 GENERATING CAPACITY: 11 Megawatts (MW) THERMAL OUTPUT: 100,000 lbs/hour steam FUEL: Natural Gas and Distillate Fuel Oil EQUIPMENT: (2) 5.5 MW Gas Turbines (2) 50,000 lb/hr recovery boilers (2) auxiliary duct burners 750 kW Black start generator TOTAL PERFORMANCE CONTRACT: $61 Million ESTIMATED CHP ...
-
University of Massachusetts - 16 MW CHP Plant - Case Study
Quick Facts LOCATION: Amherst, Massachusetts FUEL: Natural Gas and Oil MAX CAPACITY: 16 MW POLLUTION CONTROL: Selective Catalytic Reduction (SCR) ENVIRONMENTAL BENEFITS: 99.3% SOx Reduction, 93% NOx Reduction, 96% CO Reduction AVERAGE CAPACITY FACTOR: ~ 75% ENERGY OUTPUT: 100,000 MWh per year IN OPERATION SINCE: April 2009 EQUIPMENT: 10 MW Solar Gas Turbine; 4 MW and 2 MW Steam Turbines USE OF ...
-
Smith College Energy Center - 3.5-MW CHP Plant - Case Study
Quick Facts LOCATION: Northampton, MA FACILITY PEAK LOAD: 3.5 megawatts (MW) EQUIPMENT: 3.5 MW Solar Turbine, Rentech HRSG, package boiler and two York absorption chillers. FUEL: Natural Gas USE OF THERMAL ENERGY: Heating, cooling & hot water for the campus. USE OF ELECTRICAL ENERGY: Displaces campus loads previously supplied by the local utility. AVERAGE CAPACITY FACTOR: 75 % CHP IN ...
-
Mississippi Baptist Medical Center - 4.6 MW CHP System for Critical Infrastructure - Case Study
Quick Facts LOCATION: Jackson, Mississippi MARKET SECTOR: Hospital CHP IN OPERATION SINCE: 1991 GENERATING CAPACITY: 4.6 Megawatts (MW) THERMAL OUTPUT: 30,000 lbs/hr steam COOLING CAPACITY: 2,000 tons chilled water EQUIPMENT: Solar Centaur Gas Turbine Heat Recovery Steam Generator Auxiliary Duct Burner Two (2) Absorption Chillers FUEL: Natural Gas USE OF THERMAL ENERGY: Heating, domestic hot ...
-
Cogeneration Renovation of Cofely`s Saint Quentin Installation - Case Study
In 2012, Cofely’s Picardie branch, the site’s exploiter, entrusted the renovation of a cogeneration installation in Saint Quentin, in the Aisne province, to Clarke Energy. Initially, this “boiler room” consisted of a turbine installed in a soundproof enclosure. Cofely could either renovate the existing turbine, or replace it with a gas engine. Cofely’s main ...
-
Waukesha Engine Upgrade Boosts Efficiency, Availability and Helps Stabilize Grid in North-East India - Case Study
To help India augment its energy basket, North Eastern Electric Power Corporation Limited (NEEPCO) recently installed three of GE’s Waukesha 275 GL+ engines as part of a gas booster station upgrade. The enhanced engine output, efficiency and availability has helped to upgrade the power station to meet the increasing demand. Background NEEPCO designs, builds and maintains power stations in ...
-
Waukesha engine upgrade boosts efficiency, availability and helps stabilise grid in North-East India - Case Study
To help India augment its energy basket, North Eastern Electric Power Corporation Limited (NEEPCO) recently installed three of GE’s Waukesha 275 GL+ engines as part of a gas booster station upgrade. The enhanced engine output, efficiency and availability has helped to upgrade the power station to meet the increasing demand. Background NEEPCO designs, builds and maintains power stations ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you