gasification power plant Articles
-
Biomass gasification power plant in Bulgaria
ZeroPoint deployed the first of its kind biomass gasification power plant in Bulgaria. The project developer was Bara Group Ltd., a fully owned subsidiary of CEZ, a. s. – one the largest utility companies in Central and Eastern Europe. The project was a 4.5 MWe Combined Heat and Power plant using the ZeroPoint gasification technology and woodchips as a primary source. In 2014 Bara ...
-
Thermodynamic analysis of an integrated gasification combined cycle power plant: effect of nitrogen supply on system performance
A comprehensive thermodynamic analysis of a conceptual integrated coal gasification combined cycle power plant is presented. Energy and exergy efficiencies and exergy destructions of each sub–unit are calculated. The effect of nitrogen, which is supplied from the Air Separation Unit (ASU) of the gasification unit to the combustion chamber of the gas turbine (GT) cycle, on system performance is ...
-
Technical and economic studies on the optimisation of prospective coal-fired power stations
The paper considers problems of choosing rational parameters of thermal power plants on fossil fuel. A technique for comparison of the energy and economic efficiency of prospective coal-fired power plants is described. The optimisation results of parameters of combined-cycle plants with coal gasification at low and high-temperature levels and steam turbine plants on supercritical steam parameters ...
-
Thermo-economic efficiency of low capacity coal-based power plants
The method of estimation of thermo-economic factors, allowing the justification of the construction of low capacity coal-based power plants has been developed in the present paper. The C-curve method applied for thermo-economic analysis is used here for determination of the optimal ratio between specific exergetic and cost-performance factors. The results of the analysis show that for coal-based ...
-
Energy self-sufficient farm fueled with biomass Finland - Case Study
Kuittila Farm in Nurmes is a dairy farm on 150 cows. Barn, grain and woodchips drying facilities, metal workshop and the main building have annual electricity consumption of approximately 340 000 kWh, and heating consumption of approximately 700 000 kWh. Due to the high consumption it was decided that the farm should be made self-sufficient in both electricity and ...
By Nocart Ltd.
-
Renewable energy programmes in India
With a strong industrial base and successful commercialisation of technologies in renewable energy, India is in a position today to offer state-of-the-art technology to other developing countries and is poised to play a leading role in the global movement towards sustainable energy development. India has a separate ministry to promote renewable energy sources, which has been named Ministry of ...
-
2nd Progress meeting on the APOLLON project
2nd Progress meeting on the APOLLON project Introduction In Piacenza, Italy, has been held the 2nd progress meeting of the APOLON Project, so far the biggest integrated Photovoltaic project of FP7 whose main final objective is the development of point focus (PF) and dense array (DA) systems with a target cost of 2 Euro/W. In order to answer to the industrial need to speed up the ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you