High Temperature Flare (HTF) - Case Study #170605
PROJECT DETAILS Location: Beaumont, TX Product Loaded: Gasoline Max RVP: 10.20 PSIA @ 109 °F Max Liquid Loading Rate: 7,000 GPM Max Inlet Flow Rate: 52,087 ACFH Rated Heat Release : 81 MMBTU/HR Max VOC Concentration: 45% Inlet Temperature: 100°F MAX Aereon’s Abutec HTF (High Temperature Flare) is designed to maintain high destruction efficiency and removal efficiency, ...
-
Hofstetter high temperature flares in Brazil (CO2 certificates)
Type HOFGAS®- Efficiency 2500 (2x) Commissioning 2003 Site Bandeirantes(Saõ Paulo, BR) Situation The landfill of Saõ Paulo, the largest city in South America, extends over 140 ha. For a period of 4 more years several thousands tons of waste will be deposited. The power potential of this landfill will be used to generate electricity. Within the framework of the Kyoto Protocol ...
-
High temperature combustion of landfill gas
Type Compact plant HOFGAS® - Efficiency 250 Commissioning December 2001 Site Storkohmo landfill, Kokkola (FIN) Situation Storkohmo landfill is located 400km north of Helsinki on Finland's west coast near the city of Kokkola. Based on local legislation requirements ( reduction of green house gas emissions ) the gas collection system, compressor station with automatic methane ...
-
1:60 Control Range with Flare
Type HOFGAS®- LPM 3000/2500 Performance 2,500 Nm³/h, 12,500 kW Location Central England (GB) Initial Situation The landfill site is situated in the middle of the Sheffield region. Over time, the city limits and the landfill site have grown together. Therefore, the operator is particularly sensitised to minimising odour and noise emissions. Furthermore, the escaping gas is to be ...
-
5000Nm3/h HT Flares in Sao João, Brazil
Type HOFGAS®-Efficiency 5000 Performance 3x 5,000 Nm3/h, 75,000 KW Location Sao João (BR) Technical requirements Surplus combustion of 15,000 Nm3/h landfill gasCompliance with the UNFCCC regulationsHigh temperature combustion at 1,000-1,200°CHolding time ≥ 0.3s HOFSTETTER solution concept Use of 3 HOFGAS®- Efficiency 5000 high temperature flares. These are the largest ...
-
Large-scale application
Type HOFGAS®- Ready 2500 (2x) Commissioning 2002 Client Cleanaway (Pitsea, GB) Situation The 2.8km2 big Pitsea landfill is located 50km east of London. It takes 2 to 3 years until the process of a landfill releases constantly gas. To compensate the initial unsteadiness, the 2 compact units with high temperature flares have been installed in two stages. A gas-to-energy project is ...
-
Low emissions from large plants too
Type HOFGAS®- LPM 3000 Performance 3’000 Nm³/h, 15’000 kW Location Scotland (GB) SituationEvery year, 150’000 tonnes of waste from Edinburgh, Lothian and the Borders Region are brought to the Dunbar landfill site. The waste is transported by rail to the site. In 2002, the UK Environmental Agency (EA) introduced the strictest emission regulations in Europe. The flue gases are not ...
-
High Temperature Combustion of Biogas
High Temperature Combustion of Biogas Efficient combustion of biogas Controlled and concealed combustion Combustion temperature > 900°C Residence time more than 0.3 s Insulated combustion chamber High safety standard The HOFGAS® - IFL4c high temperature flare provides safe and environmentally-friendly combustion of biogas. The exhaust gas emissions meet the stringent requirements. ...
-
Containerised Solution
Type HOFGAS®- Ready/C 1500 Commissioning 2003 Site Malaga (ES) Situation This landfill is situated in Malaga on the coast of southern Spain. In 1999 Hofstetter installed a simple measuring flare HOFGAS® - Smarty 500, which delivered precise data of the gas quality and quantity. The measured values supported the landfill operator with the project feasibility study of the ...