Municipal Incinerator Waste
The monitoring of metal concentrations in the waste water from municipal incinerators to ensure compliance with the EU Waste Incineration ...
-
Why ‘custom-built’ is often cheaper than off the shelf
We know that we’ve said it before, but even though we list what we call our ‘standard range’, by far and away most of the incinerators and cremators we manufacture are specially designed and manufactured to match the individual needs of each customer. Since everyone’s requirements are different, virtually every unit we produce is ‘made to order’ and the point ...
-
Waste incineration in cement plants: constraints and development opportunities (a French-German comparison)
Is it possible to reconcile economic and ecological concerns? This article examines, through a French-German comparison, the case of obtaining a calorific value for wastes used as substitute fuels in cement kilns. On the one hand, this new strategy for obtaining needed inputs offers to the cement industry an economic opportunity for lowering production costs (the main determinant of ...
-
Rzeszow, Poland Project - Case Study
A new waste incineration plant in Rzeszów delivered by Termomecanicca / Astaldi consortium as a general contractor. It will be complemented by Radscan's installation. This is the first such a plant in Poland where waste incineration is combined with heat recovery by flue gas condensation. The delivery includes quench, and condenser. Montage start September 2017, take over May ...
-
Waste incineration for urban India: valuable contribution to sustainable MSWM or inappropriate high–tech solution affecting livelihoods and public health?
Urban India is facing huge challenges in terms of population growth and resultant infrastructural needs. Municipal solid waste management (MSWM) still remains a challenge for urban local bodies. Municipal solid waste (management and handling) rules, 2000 was a first step in India towards organising the system, but till date the systems are largely insufficient and/inefficient. Focus on the urban ...
-
Incinerator location conflict: How opponents try not to be the losers of the public decision making?
The lack of monetary compensation and the difficulty for residents to exit close to an incinerator lead them to protest the construction of waste facilities. Opponents try to change undesirable locations to maintain their welfare. With a cost-benefit analysis, our incinerator location model attempts to measure both transportation and externality costs in comparable units. Two extreme behaviours ...
-
Knowledge, attitude and practices toward dioxins in China's waste incineration industry and coking industry
A questionnaire was used to survey the knowledge and attitude of senior managers toward dioxins at five waste incineration plants and seven coking plants. A field survey was performed to verify dioxin control practices at two of the waste incineration plants and one of the coke plants. All the respondents at the waste incineration plants claimed to be knowledgeable about dioxins and had a ...
-
How to Choose Refractory Materials for Waste Incineration Industry?
Waste incineration rotary kilns, operating in extreme conditions, require the careful selection of appropriate refractory materials capable of withstanding high temperatures, chemical attack, and mechanical stress. The choice of refractory materials for waste incineration rotary kilns is paramount in ensuring optimal performance, longevity, and safety. Here are key factors to consider when ...
-
Advantages of Waste Incineration
Waste incineration is a treatment process that involves the combustion of organic substances contained in waste materials by means of high temperatures. Waste Incineration technology can be installed in several sectors to treat hazardous waste, refining residues, chemical waste, pharmaceutical waste, hospital & medical waste, waste water plant sludge, NORM (natural radioactive) waste, etc. ...
By TECAM
-
Flow metering of brown coal coke dust - Case Study
Client: Waste incinerator plant Product: brown coal coke ...
By ENVEA
-
Ebola Outbreak - Prepared, Experienced and Ready to Deploy
Inciner8 have plenty of experience in supporting humanitarian efforts around the globe through our provision and installation of medical waste incinerators to safely destroy any infected waste. All our medical models are fully equipped to handle the waste fall-out from the treating of suspected cases right through to (if required and regionally acceptable) pathological waste. Experience counts ...
-
Flow metering of hearth furnace coke - Case Study
Customer: Waste incinerator plant Material: Hearth furnace ...
By ENVEA
-
Hangzhou Jiufeng Waste Incineration Power Plant Leachate Concentrate Reduction Treatment Project
Project detail: Hangzhou Jiufeng plant is Everbright International’s highest standard waste incineration power plant, located in the Jiufengshan natural scenery area-an environmentally sensitive area. The total waste treatment capacity is designed to be 3,000tons/day, Everbright International has adopted the most advanced technology and the most reliable suppliers in this project. Jiarong ...
-
Case Study - Hangzhou Jiufeng Waste Incineration Power Plant Leachate Concentrate Reduction Treatment Project
Project detail: Hangzhou Jiufeng plant is Everbright International’s highest standard waste incineration power plant, located in the Jiufengshan natural scenery area-an environmentally sensitive area. The total waste treatment capacity is designed to be 3,000tons/day, Everbright International has adopted the most advanced technology and the most reliable suppliers in this project. Jiarong ...
-
Come and see us at Arab Health 2017
Inciner8 will be present at the upcoming Arab Health exhibition. Our experienced, multi-lingual team will be on hand to answer any queries you may have about our innovative and award winning range of incinerators and waste processing accessorises built specifically for the medical sector. During the 5 days we will be running some small presentations that address key issues within the medical ...
-
Shenzhen Waste Incineration Power Plant Leachate Treatment
Project detail: Jiarong has provided the external TUF membrane leachate treatment systematic solution for laohukeng waste incineration power plant. The total processing capacity of this project is 1745m³/d handled by 50 units of M-C200-VFU100-08-3m MEMOS membrane modules. It’s one of the biggest waste incineration plant external tubular membrane leachate treatment projects in China; ...
-
Oceans Apart - `Fantasy Island`
According to official statistics, a single tourist produces 3.5kg of garbage a day, twice as much as someone from Malé and five times more than anyone from the rest of the Maldives archipelago. Altogether, that comes to “300 to 400 tons of trash” dumped on the island every day, according to Shina Ahmed, administration manager of the Thilafushi Corporation that runs the island. ...
-
Ebola Outbreak - Prepared, experienced and ready to deploy
Inciner8 have plenty of experience in supporting humanitarian efforts around the globe through our provision and installation of medical waste incinerators to safely destroy any infected waste. All our medical models are fully equipped to handle the waste fall-out from the treating of suspected cases right through to (if required and regionally acceptable) pathological waste. Experience counts ...
-
Nuclear Waste Incineration (France) - Case Study
Nuclear waste incineration trials 1996 Glosfume successfully provided a pilot filter to carry out various trials on nuclear waste incineration. The filter was designed to operate under vacuum and passed all of the stringent requirements of French Nuclear Fuels. Similar filters have subsequently been used on several sites throughout France, contributing to reduced waste disposal costs and ...
By Glosfume
-
Monitoring of garbage chutes - Case Study
Application Waste recycling in incineration plants starts with the delivery and incineration of waste. The waste reaches the combustion chamber via a falling chute, which is followed by a hydraulic feed device. To guarantee a constant incineration process, the falling chute has to be fi lled constantly. The „high“ and „low“ limit values should be detected and alarmed. The ...
By ENVEA
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you