Lockhart minimum flow - Case study
Lockhart Power is the owner and operator of a number of hydro projects located in South Carolina. In 2011, CHC provided two water-to-wire packages for two new Lockhart hydro sites: a 1250 mm vertical axial flow Propeller minimum flow unit with generator and controls for the Lockhart Minimum Flow project and a 1700 mm axial flow Kaplan turbine with generator and controls for the Upper Pacolet ...
-
Namewaminikan hydro development - Case study
Two new generating stations, Long Rapids and Twin Falls, located on the Namewaminikan River in Northern Ontario were commissioned in the spring of 2017. CHC provided a total of four 1850 mm axial flow Kaplan turbines with synchronous generators and hydraulic power units. The Namewaminikan hydro development has a combined output of 10 MW. The Namewaminikan hydro project was optimized to reduce ...