Tulloch 3rd unit addition - Case study
Located on the Stanislaus River in central California, the Tulloch Dam operates two vertical Francis units for a combined output of 18 MW. Commissioned in 2012, CHC provided an additional 1650 mm conventional Kaplan turbine-generator set which was added on the low level outlet of the dam, and which produces over 6.7 MW of additional power using the water that spills over the dam. The complete ...
-
Lockhart minimum flow - Case study
Lockhart Power is the owner and operator of a number of hydro projects located in South Carolina. In 2011, CHC provided two water-to-wire packages for two new Lockhart hydro sites: a 1250 mm vertical axial flow Propeller minimum flow unit with generator and controls for the Lockhart Minimum Flow project and a 1700 mm axial flow Kaplan turbine with generator and controls for the Upper Pacolet ...
-
West charleston hydro - Case study
In 2004, Great Bay Hydro Corporation acquired four generating facilities in Vermont, including the West Charleston Hydro plant which had been out of operation and abandoned for a number of years. The West Charleston plant was built in the early 1900s and is located on the Clyde River in the town of Charleston, Vermont. In 2010, as part of the re-permitting process and in order to meet current ...
-
Namewaminikan hydro development - Case study
Two new generating stations, Long Rapids and Twin Falls, located on the Namewaminikan River in Northern Ontario were commissioned in the spring of 2017. CHC provided a total of four 1850 mm axial flow Kaplan turbines with synchronous generators and hydraulic power units. The Namewaminikan hydro development has a combined output of 10 MW. The Namewaminikan hydro project was optimized to reduce ...
-
Project - 1.6 MW, NY
Year: 2017 Running Gear: Vertical shaft Kaplan turbine with synchronous generator. Scope: Replacement control system and exciter. Located in upstate NY, this hydroelectric plant was built in the mid-1980s in response to the federal PURPA legislation. The site is well suited to hydropower, with a small labyrinth dam spanning the river banks just above a beautiful cascade into a deep gorge. ...
-
Project - 455 KW, MA
Year: 2016 Running Gear: 3 units: Vertical shaft synchronous generator driven by a Francis turbine. Vertical shaft synchronous generator driven by a propeller turbine, and a vertical shaft induction generator driven through a flat belt by a Kaplan turbine. Scope: Replacement control system, switchgear, excitation, wicket gate operators.. Located in Massachusetts, this hydroelectric plant ...
-
Boba and Las aarias hydro - Case study
The Canal Boba and Las Barias Hydro projects were developed by the local Dominican utility with the Montreal engineering firm of Dessau Soprin. CHC provided two identical water-to-wire equipment packages, each including a 1250 mm axial flow Kaplan turbine, 900 kW/450 RPM synchronous generator hydraulic power unit and switchgear, controls and protection package. The projects were commissioned ...
-
Black river falls hydro - Case study
CHC provided a complete water-to-wire equipment package to the City of Black River Falls, Wisconsin, for the upgrade of its Black River Falls Hydroelectric Dam, located on the east bank of the Black River in Jackson County, Wisconsin. This historic dam rebuilding project was completed in June 2012, and involved the installation of an additional low-flow generating unit. The water-to-wire ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you