Online flow measurement of fly ash to control process conditions - Case Study
Customer: Cement plant Material: Fly ash Installation: After hopper and screw feeder Function: Online information about the quality of flow condition APPLICATION Fly ash does have the tendency to create blockages in the cone of the hopper and screw feeder. Our customer was looking for a solution to provide information about the quantity of material flow behind the hopper to control the flow ...
By ENVEA
-
Newbuild Power Station in Karlsruhe - Case Study
EnBW is one of the biggest German energy suppliers. A major new build bituminous coal fired power plant construction project is the new boiler number 8 of the Rheinhafen Dampfkraftwerk (RDK) in Karlsruhe. The new boiler will have a capacity of 912 MWel with a heating capacity of 220 MWth. The unit will be erected beside the existing units RDK4s and RDK7 and have a net efficiency of > 46% ...
-
Vattenfall`s Cogeneration Power Plant Reuter West - Case Study
The cogeneration power plant “Reuter West” was erected as a base load power plant in the vicinity of the existing “Reuter” plant. The two hard coal fired 300 MW units D and E were commissioned in 1987 and 1989. Today the cogeneration units supplying electricity and thermal energy are operated by Vattenfall Europe GmbH. The heart of each power plant is the boiler where the ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you