MSW incineration plant Articles
-
NIMES - Case Study
France: Baling of MSW The incineration plant of Nimes, France has a capacity of 110,000 tonnes/year in one line. The choice of a single line of 14 tonnes/hour instead of two lines (2 x 7 tonnes/hour), significantly reduces the amount of investment, this was made possible by the installation of the Flexus baling system that ensures the ability to receive waste even when the incinerator is out of ...
-
Refuse Derived Fuel, Current Practice and Perspectives
Untitled Document Summary I OBJECTIVES The objectives of the project were to undertake a survey on the current practices of production and use of refuse derived fuel (RDF) in the fifteen Member States of the European Union, as well as to undertake an overview of the legal and policy framework of RDF production and use; an assessment of the environmental impacts and of the ...
-
Incinerator Plant, Lidköping - Case Study
SWEDEN: Baling of MSW In Lidköping the incineration plant is connected to the central heating systems of the city. However, incineration plants has a high demand for fuel in the winter season and limited demand in the summertime. Inflow of material, however, comes evenly all year around and this gives a need to store waste during the summer. The solution to this is the Flexus round baling ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you