Pelton turbine Articles
-
HPP Corani, Bolivia 15 MW Horizontal Pelton Turbine - Case Study
Our company has succesfully completed all tests and put into commercial operation our 15 MW Horizontal Two-Nozzle Pelton Turbine of HPP Corani, Bolivia. Besides 15 MW power generating technology we have also supplied and installed steel Penstock of the Length 15 m and DN 800 PN 100 including Bifurcation and inlet Spherical ...
-
Project Klemtu II Hydro British Columbia, Canada - Case Study
Statistics: Turbine: One 820mm double nozzle Pelton Generator: One 1800kW WEG @ 900 RPM Rated head: 310m Rated flow: 0.66m3/sec Commissioned: November 2009 This new facility replaces the existing 600kW power plant of which the generation equipment was also supplied by DTL (see Klemtu Village project in 1984). It provides increasingly demanded power to this growing village. A new ...
-
Project Klemtu II Hydro British Columbia, Canada - Case Study
Statistics: Turbine: One 820mm double nozzle Pelton Generator: One 1800kW WEG @ 900 RPM Rated head: 310m Rated flow: 0.66m3/sec Commissioned: November 2009 This new facility replaces the existing 600kW power plant of which the generation equipment was also supplied by DTL (see Klemtu Village project in 1984). It provides increasingly demanded power to this growing village. A new penstock ...
-
1997 IFAI award devil Canyon hydroelectric power plant, San Bernardino, California - Case Study
Constant demands for water and electricity in heavily populated areas in California prompted the Devil Canyon Power Plant project. Constructed from 1969 to 1974, the power plant is located at the San Bernardino Mountains near the mouth of Devil Canyon. With two pipelines carrying water from Silverwood Lake, an elevation drop of almost 1500 ft (460 m) between the lake, and four Pelton wheel ...
-
No Place Is Too Far
The remote location of hydropower stations is often a great challenge when major repair work is necessary. The refurbishment of a large generator in the Scottish Highlands shows how Sulzer finds cost-effective service solutions even in places miles from nowhere. Much of the UK hydroelectric capacity was built during the 1950s. These installations have performed extremely well, especially ...
By Sulzer Ltd.
-
Ross Creek Hydroelectric Project - Pemberton, British Columbia, Canada - Case Study
Stistics: Turbine: One single nozzle Pelton Generator: One 150kW single phase synchronous generator @ 1200 RPM Rated head: 305m Rated flow: 0.057m3/sec Commissioned: 2012 This is one of two micro hydro power plants built for the supply of electricity to an equestrian center, which consists of three large farm buildings and one house. The two plants are within one kilometer of each, but ...
-
Monroe Cold Spring Hydroelectric Project Monroe City, Utah, USA - Case Study
Statistics: Turbine: One single nozzle Pelton Generator: One 45kW Westinghouse induction generator @ 1200 RPM Rated head: 137.2m Rated flow: 0.0329m3/sec Commissioned: 2013 The water for this project comes from Cold Spring. After passing through the power house, the water will be returned to the culinary water line so it will be available for use in the City's culinary water system. ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you