solar racking Articles

  • Fairhaven Solar Installation Case Study

    Project Overview Dynamic and Patriot have been working together since 2012 on number of ground mount projects, both post driven and ballasted. Fairhaven Landfill emerged onto the radar in October 2012, with a year-end deadline rapidly approaching. During that same time period, Patriot’s installation crew was deployed in central Massachussets, halfway through ...


    By Patriot Solar Group

  • Southbridge Solar Farm Case Study

    "Patriot Worked diligently to complete the racking installation of the project through the cold harsh winter months in less than three weeks. The quality of their team and their ability to adapt to situations that arose during the installation were unsurpassed." Project Overview Patriot Solar Group (PSG) has had a long standing relationship with Martifer Solar, completing ...


    By Patriot Solar Group

  • North Carolina Solar Installation Case Study

    Project Overview Patriot Solar Group (PSG) began working on initial racking designs during Summer of 2011.  At that time, the site was still yet to be cleared, but early soil testings confirmed that a driven post design would be suitable for the site conditions. PSG’s sales and engineering team worked closely with project engineers to ensure the racking design ...


    By Patriot Solar Group

  • Bath Michigan Solar Installation Case Study

    Project Overview Patriot worked with Peninsula Solar to design a racking system that would work with limited space and not penetrate the ground surface. The ground mount array utilized a non-penetrating ballasted design to work with the existing terrain on top of an underground house. To save space in the yard, the North row utilized a longer post to allow closer ...


    By Patriot Solar Group

  • Manchester Michigan Solar Installation Case Study

    Project Overview: Patriot Worked with Oak Electric to design a post driven ground mount array to work well with the sloped terrain and maintain low visibility. The array consisted of 62, 327W modules and will provide both grid tie net metering and a battery back up system for the residential customer. Patriot met with Oak Electric at the site location to plan out the exact location and ultimately ...


    By Patriot Solar Group

  • Interactive Resources Wins National Renewable Energy Laboratory Contract for Roof Structural Assessments for Installation of Solar Photovoltaic Arrays

    Richmond CA, October 19, 2010   – Richmond architecture and engineering firm Interactive Resources was recently awarded a contract by the National Renewable Energy Laboratory (NREL) to provide solar feasibility studies for 24 California K-12 school buildings in Alameda and Contra Costa Counties. The Sequoia Foundation ...


    By Interactive Resources

  • U.S. Nuclear Power in Decline

    Nuclear power generation in the United States is falling. After increasing rapidly since the 1970s, electricity generation at U.S. nuclear plants began to grow more slowly in the early 2000s. It then plateaued between 2007 and 2010—before falling more than 4 percent over the last two years. Projections for 2013 show a further 1 percent drop. With reactors retiring early and proposed ...


    By Earth Policy Institute

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you