thermal energy storage molten salt Articles
-
Fire halts construction at Chile`s first CSP tower; US channels $30 million into CSP research
Fire stops building work at Cerro Dominador in Chile A fire broke out Tuesday at the 110 MW Cerro Dominador CSP project, currently under construction in Chile's Atacama desert, the developer said on Twitter. The fire was spotted at 20:00 local time Tuesday at the top of the 250-meter receiver tower, development company Cerro Dominador, a subsidiary of EIG Global Energy Partners, said. By ...
-
Chile CSP pioneer signs PPA with Copec; Silicon storage to replace Aurora CSP project
Cerro Dominador signs PPA with Copec energy group Cerro Dominador, Latin America's first CSP plant, has signed a five-year power purchase agreement (PPA) with Chilean fuel distributor Copec, Cerro Dominador, a subsidiary of EIG Global Energy Partners, said December 11. Located on a 146-hectare site in the Atacama desert, the 110 MW Cerro Dominador plant will enter commercial operations this ...
-
Designing renewable contracts that value CSP storage
As California ramps up its storage requirements, it has not included Concentrated Solar Power (CSP) with integrated energy storage. Instead it is testing pilot projects using batteries at utility-scale, even though it must be obvious to bean counters at utilities that batteries are never going to compete with utility scale CSP storage. By Susan Kraemer The 32 MWh battery storage pilot for ...
-
Cerro Dominador CSP developer plans larger plants in Chile
The ground-breaking 110 MW Cerro Dominador CSP plant could start commissioning by end of 2019 and the fund-owned developer is studying larger projects at three other sites in northern Chile, Francisco Vizcaino, Project Director at Cerro Dominador, told New Energy Update. After a troubled start, Latin America's first utility-scale CSP plant is now in the final stages of construction. Located ...
-
Chile CSP developer predicts world’s lowest price in June
The Cerro Dominador group is working with strong construction partners on its Likana CSP project to cut costs and beat gas plant prices, buoyed by progress at its first plant in Chile, Fernando Gonzalez, CEO of Cerro Dominador, told the CSP Madrid 2019 conference. As developer Cerro Dominador nears completion of Latin America's first CSP plant in Chile, the company is preparing what could be ...
-
Net-zero path 2050 and the role of energy storage
Summary Present climate pledges, even if fully achieved, would fall short to give the world a chance of limiting the global temperature rise to 1.5 °C. Therefore, the world needs to commit on a viable and actionable path to achieve Net-Zero by 2050. While renewables and energy storage are the backbone of the energy transition to achieve Net-Zero by 2050 in the power sector …, the ...
-
The thermal energy storage is the key for decarbonization
Summary Thermal energy storage plays a key role in the energy transition process. It makes possible to overcome the intermittence’s obstacle inherent to traditional renewable power generation sources (such as wind or solar), or the mismatch between available energy production and consumer’s demand, solved nowadays by inefficient management of resources, with paid plants on standby ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you