turbine bearing Articles
-
Auxiliary Service Units on Large Hydro Facilities - Case Study
Ossberger Hydro also has technologies that are well adapted to implement on larger hydroelectric facilities to provide power for auxiliary services whether it is mechanical pumps for oil circulation on main turbine bearings, managing auxiliary electric loads, or even provide black start capability in case of emergencies. Project: LG-1 Client: Hydro Quebec Location: James Bay, Quebec, Canada ...
-
Case Study - Aluto Langano Power Plant Rehabilitation
Aluto Langano, Ethiopia – 2007 The Aluto Langano Geothermal Pilot Plant (ALGPP) is located on the Aluto volcanic complex of the Ethiopian Rift valley, close to the eastern escarpment between Lake Langano and Lake Ziway, some 200 km southeast of Addis Ababa. The Aluto volcanic complex is a young acidic system consisting of domes, lava, and pyroclastic interbeds. The geothermal field was ...
-
Project - 600 KW, NY
Year: 2018 Running Gear: Three units: One vertical shaft Francis turbine with synchronous generator. One horizontal shaft turbine with synchronous generator. One horizontal shaft double-runner turbine with synchronous generator. Scope: Replacement control system, switchgear, and HPU. Black start capability. Located in a small town in the Adirondak mountains in upstate NY, this ...
-
Namewaminikan hydro development - Case study
Two new generating stations, Long Rapids and Twin Falls, located on the Namewaminikan River in Northern Ontario were commissioned in the spring of 2017. CHC provided a total of four 1850 mm axial flow Kaplan turbines with synchronous generators and hydraulic power units. The Namewaminikan hydro development has a combined output of 10 MW. The Namewaminikan hydro project was optimized to reduce ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you