turnkey biogas Articles

  • ERigene 200m3 Biogas Storage

    French anaerobic digestion specialists ERigene are a turnkey supplier of complete AD systems, both biogas production and value-added usage. The ERibox system can comprise any number of modular AD units that are delivered to site. They are factory built hook-lift boxes and are connected together to run automatically, with the added peace of mind of remote monitoring. If more capacity is required, ...


    By Base Structures Ltd

  • AD and Biogas Technology Developments in UK

    The anaerobic Digestion and Biogas Association’s fourth annual trade show and conference — UK AD & Biogas 2013 — attracted a busy stream of visitors to Birmingham, England in early July, demonstrating a growing interest in this vibrant industry sector. The event included facility tours, conference sessions, workshops, free one-on-one consultations with industry experts, ...


    By BioCycle Magazine

  • Biogas Plant in Verneuil, Dairy Cooperative - Case Study

    In 2014, the dairy cooperative of Lochoise region, has awarded Clarke Energy the installation of a cogeneration module on its anaerobic digestion site, located at Verneuil-sur-Indre in Indre et Loire. The biogas plant which was established in 2014, consumes discharges from milk production, the wastewater treatment ...


    By Clarke Energy

  • Idex Environnement’s Biogas plant at Amiens - Case Study

    The Anaerobic Digestion (AD) plant in Amiens is operated by Idex Environment. The biogas is derived from the municipal solid waste (MSW) originating from the local area. Clarke Energy has delivered a full turnkey installation for this site, creating renewable energy. The engines supplied for this project are two JGMC ...


    By Clarke Energy

  • Thoeni, Allens Farm Biogas Installation - Case Study

    Allens Farm anaerobic digestion (AD) facility is located within the beautiful countryside of Colchester, which is said to be the oldest recorded town in Great Britain. The farm is run by three partners – David Hunter, Charlie Lochore and Will Lochore, who felt ...


    By Clarke Energy

  • Sherwood Energy Village - case study

    Local community project harnesses heat pump technology to build a sustainable future. Sherwood Energy Village (SEV) is a former colliery site in the East Midlands. In 1994 following the colliery’s closure the local community tasked itself with bringing sustainable development into the mainstream. ENER-G’s low cost sustainable heat pump technologies provided the SEV with a local ...


    By ENER-G

  • East Midlands airport, UK - case study

    Every year East Midlands Airport (EMA) connects 5 million passengers to over 100 travel destinations around the globe. The airport has won a number of prestigious travel awards including the World’s Leading Eco Friendly Airport in 2007. EMA contacted ENER-G regarding the provision of a sustainable solution to provide heating and cooling for their New Departures Pier. After an initial ...


    By ENER-G

  • St. John’s college, Oxford - case study

    St John’s College, Oxford, will reap substantial financial and environmental benefits from sustainable low-cost technology, supplied by the company ENER-G— heat pump solutions provider. The 500-student college – established in 1555 – is among educational institutions across the country that are taking advantage of low cost, renewable ground source energy for heating, ...


    By ENER-G

  • Malvern Community Hospital, Worcestershire - case study

    ENER-G delivered a solution that combines two low carbon technologies – a ground source heat pump system and a combined heat and power (CHP) unit - as part of the eco-friendly design brief set by Interserve, which was contracted by Worcestershire Primary Care Trust to build the £17.7 million new hospital. The 24-bed hospital will utilise renewable geothermal energy for heating, ...


    By ENER-G

  • Redhill Primary School - case study

    Reducing energy costs and shrinking carbon footprint without compromising on comfort When it came to choosing the right heating and cooling solution for Redhill Primary School, Worcestershire County Council wanted a sustainable alternative to the less environmentally friendly methods of oil or gas. ENER-G Sustainable Technologies (EST) delivered a full turnkey solution from thermal conductivity ...


    By ENER-G

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you