turnkey waste gas Articles

  • Rectify dry cycling of gas boilers and reduce energy costs by 25%

    Building engineers, energy and facilities managers tend to overlook that many gas boilers waste energy through dry cycling when they are not actively contributing to the building heating and hot water demand. It is often thought that existing building management systems (BMS) and building energy management systems (BEMS) are optimising the boilers to remove dry cycling. However, the BMS is ...


    By Vital Efficienci Ltd.

  • Thoeni, Allens Farm Biogas Installation - Case Study

    Allens Farm anaerobic digestion (AD) facility is located within the beautiful countryside of Colchester, which is said to be the oldest recorded town in Great Britain. The farm is run by three partners – David Hunter, Charlie Lochore and Will Lochore, who felt ...


    By Clarke Energy

  • Idex Environnement’s Biogas plant at Amiens - Case Study

    The Anaerobic Digestion (AD) plant in Amiens is operated by Idex Environment. The biogas is derived from the municipal solid waste (MSW) originating from the local area. Clarke Energy has delivered a full turnkey installation for this site, creating renewable energy. The engines supplied for this project are two JGMC ...


    By Clarke Energy

  • Biomass fired thermal oil heater case study

    This 12 MWth output Biomass Power Plant is one of the turnkey products of Biomass Power. The plant was fully commissioned in December 2006. The system has a capacity of 12 MW thermal output producing up to 10MWth of 300°C 10 Barg pressure hot oil, up to 10 tonnes per hour of steam and 2 MWth of 200°C hot air. This is all achieved from one grate heating three separate heat exchanges. The ...


    By Biomass Power Limited (BPL)

  • Malvern Community Hospital, Worcestershire - case study

    ENER-G delivered a solution that combines two low carbon technologies – a ground source heat pump system and a combined heat and power (CHP) unit - as part of the eco-friendly design brief set by Interserve, which was contracted by Worcestershire Primary Care Trust to build the £17.7 million new hospital. The 24-bed hospital will utilise renewable geothermal energy for heating, ...


    By ENER-G

  • Redhill Primary School - case study

    Reducing energy costs and shrinking carbon footprint without compromising on comfort When it came to choosing the right heating and cooling solution for Redhill Primary School, Worcestershire County Council wanted a sustainable alternative to the less environmentally friendly methods of oil or gas. ENER-G Sustainable Technologies (EST) delivered a full turnkey solution from thermal conductivity ...


    By ENER-G

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you