waste incinerator project Articles
-
Zhongke Ecology Wuzhong City Waste Incineration Sludge Disposal Project - Case Study
PROJECT BACKGROUND Project: Zhongke Ecology Wuzhong City Waste Incineration Sludge Disposal Project Sludge Type: Centralized Disposal Sludge Construction: Jan., 2020 Sludge Scale: 100T/D Completion: Mar., 2020 PROJECT OVERVIEW Equipment Selection: SBWHD40000'2 Dewatering Machine: Mechanical Wet Moisture: 85% Dried Moisture: 35% Features Efficiency Innovation Environment ...
-
Waste Incineration Plant CO Measurement Project
Customer: Waste Incineration Plant Material: Waste Function: Exact measurement of CO Context & Application Nowadays, the waste in all kinds industries has a significant influence on human’s life. People choose to bury it underground many years ago while as time going by, the bad quality of our soil and less underground space is put our living environment in danger. So big quantity ...
-
A STIEFEL project Waste Incineration Plant (KVA) Trimmis case study
The waste incineration plant (KVA) Trimmis is situated in the eastern part of Switzerland and is connected to the railway network. As it is the only incineration plant in this province, it serves a large area with approximately 131’000 inhabitants. The local authorities waste disposal association named GEVAG is a public body serving 43 convention communities and 97 associated municipalities ...
-
Hangzhou Jiufeng Waste Incineration Power Plant Leachate Concentrate Reduction Treatment Project - Case Study
Application: Leachate Concentrate /Fly ash washing wastewate Scale: 450 tons / day of concentrated liquid reduction, 180 tons / day of fly ash washing wastewater INTRODUCTION Everbright Domestic Waste Incineration Power Plant Project in Zhongtai, Yuhang District, Hangzhou City (hereinafter referred to as: Hangzhou Jiufeng) is a waste incineration power plant constructed by Everbright ...
-
Case study - Perstorp Speciality Chemicals AB,Perstorp, Sweden
Customer: Perstorp Speciality Chemicals AB,Perstorp, Sweden Project: Chemical Waste Incinerator operating WESP Perstorp AB started up their Chemical Waste Incinerator year 2007. The emission standard to meet stated < 5 mg/Nm3. With a standard as low as 5 mg the natural choice ended up in a WESP. Result The plant has operated continuous mode since 2007. On-line measurements shows emissions ...
-
Suzhou Waste Incineration Power Plant Leachate Treatment Project
Process: DTRO Our highly effective DTRO system is specially designed for treatment of highly contaminated wastewater, such as leachate or pharmaceutical wastewater. This system functions independently and automatically. We have installed more than 500 such systems worldwide with a remarkable for quality and service. We are committed to providing a comprehensive service for our clients. As such, ...
-
A time to reflect … and to look ahead
Past achievements and future targets for the world’s leading incinerator specialists It’s almost Christmas and another (extremely hectic) year is now drawing to a close. So although it is a time when we can look back with enormous pride on twelve months that were crammed with impressive achievements and at a few of the momentous moments in our calendar, it also time to look ahead ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you