wind turbine installation contractor Articles

  • Offshore wind costs and development risk

    How procurement strategies, manufacturing costs and new technology stack up against development risk in Offshore Wind Projects. Offshore wind is changing, and it is changing for the better. In 2006, offshore wind deployment costs started rising significantly, from £1.5m/ MW, in 2016 prices, to over £4m/MW in 2012, without a clear indication as to what the price ceiling would ...


    By SgurrEnergy Ltd.

  • Gamesa, Northrop Grumman to collaborate in offshore wind

    Spanish wind technology giant Gamesa and U.S. defense contractor Northrop Grumman (Los Angeles, CA) have signed an agreement under which the two companies will collaborate in the development of technologies for offshore wind facilities. Under the terms of the agreement, Northrop Grumman Shipbuilding will apply its experience in heavy load logistics, systems performance, and reliability ...

  • UK offshore load factors accelerate on tech breakthroughs: 10-year study

    UK offshore load factors accelerate on tech breakthroughs: 10-year study The Crown Estate’s Offshore Wind Operational report 2015 shows there has been a gradual increase in the load factor for the UK fleet since 2004 on the back of more productive wind turbines, wind farms being built at windier sites and improved plant availability. The Crown Estate manages UK sovereign ...

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you