Project Braintree Electric Light Department (with Borrego Solar) - Case Study
- Size: 2MW/4MWh
- Battery Technology: Li-Ion (Samsung SDI)
- Use Case: Renewables support and peak load reduction
- IHI’s Scope: Control platform and autonomous operation (ESWare)/system integration
-
Most popular related searches
Customer comments
No comments were found for Project Braintree Electric Light Department (with Borrego Solar) - Case Study. Be the first to comment!