Project - East Lansing, Michigan Steam Plant - Cogeneration
Courtesy of CMC Solutions, LLC
Capacity: 50.5 mmBTU
A University Steam Plant is using a predictive emission monitoring plan (PEMS) to determine NOx and CO emissions from a gas turbine. The turbine is a 14.8 MW gas fired turbine Solar Titan 130 located at the plant in Michigan (Ingham County). The gas turbine is configured with an 80 MMBTU/hr duct burner and heat recovery steam generator that is subject to 40 CFR 60, Subpart Db. The gas turbine and controls were installed and started-up in 2006. The unit was equipped with a CEMS that was certified in December, 2006. This certified CEMS provided the quality assured data that constitutes the training dataset for the statistical hybrid PEMS model. The PEMS to be installed is a SmartCEMS Analyzer and is provided by CMC Solutions, L.L.C. with its business alliance partner Environmental Systems Corporation who is supplying the compliance report generation.
Customer comments
No comments were found for Project - East Lansing, Michigan Steam Plant - Cogeneration. Be the first to comment!