Saint-Maximin landfill (France)
Commissioning: 26th June, 2017
- 200 000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 7 000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 1.2 kilometer
- Existing gas recovery solution: leachate evaporation
- Capacity: 25 GWh/an (85,300 mmBtu)
-