Jandakot Bioenergy Plant - Case Study
Biogass Renewables undertook the development, design, finance, build, commission and operational support for the Jandakot Bioenergy Plant – processing Australian Commercial and industrial organic waste streams to power generation, Biogass Renewables handled all, approvals from planning to DER (EPA) including grid connection and sale of the renewable power generated on site. ...
-
New BioBANG unit in operation in Germany
In the end of February 2020 our technicians has made the strat of the new BioBANG unit on the biogas plant of BioEnergie Rohr GbR in Freystadt, ...
-
Economic assessment of regional bioenergy systems in Australia: a flow analysis application
This paper describes a modelling tool that integrates Material Flow Analysis, energy production and Greenhouse Gas (GHG) emissions accounting for biomass flows at a regional scale. This tool allows comprehensive analysis of alternative systems for management of biomass waste and bioenergy production in regional areas. Different possible options for processing a range of biomass waste streams can ...
-
Case study - A pellet production plant – LTD BIOENERGY Vinnytsa, Ukraine (UA)
In July 2013 we completed the project related with constructing Agro Biomass Pellet Plant near Vinnytsa, Ukraine. As a part of investment we were responsible for: establishment of guidelines for the construction of the proposed facility, preparation of technological design for a factory with a capacity of 45.000 Mg, Consultation concerning the modernization of the facilities in order to ...
-
Eilstorfer Bioenergie case study
In 2011, Eilstorfer Bioenergie built a biogas plant fed on sustainable materials. It is a community installation shared by several farmers cooperating in a joint energy project. Aside from the digester, the plant comprises of three Dreyer & Bosse CHP units. One CHP unit is located at the biogas plant to ensure the supply of heat required for the digester and adjacent pig rearing ...
-
Biomass Pyrolysis Plant: What It Really Are Capable Of Doing To Suit Your Needs
A mobile biomass pyrolysis plant can operate independently of any electrical grid and might re-locate multiple times annually. The economics of biomass pyrolysis are favorable for many different reasons. The expense of raw materials is less, and the biomass haul distance is quite a bit shorter compared to a set-site biomass pyrolysis plant. The mobile plant may be operated on a number of biomass ...
-
The gas upgrading plant in Beetzendorf (Germany) - Case Study
Location: Beetzendorf (Germany) Capacity: 350 m³/h biomethane Inputmaterials: Pig slurry, poultry manure, maize silage, grass silage Features: Plant delivers ca. 36 million kilowatt hours (kWh/a) of green energy and can supply 1,800 households with gas 36 million kilowatt hours (kWh) of green energy per year The plant in Beetzendorf successfully joins the EnviThan projects in Sachsendorf, ...
-
The second–generation ethanol in the state of São Paulo - Brazil: understanding the stakeholders' point of view
This article aims at conducting a study on the productive sector of ethanol in Brazil, specifically regarding second–generation ethanol. To map the industry the technique of stakeholder analysis was used. The primary data were collected through semi structured interviews and questionnaires with ten experts from different stakeholder groups in the industry. The results showed that the ethanol ...
-
The Landscape of Biogas Plants
China has the highest number of biogas plants among the IEA Bioenergy Task 37 member countries,with more than 100,000 biogas plants,followed by Germany with over 10,000 plants.In addition to the 100,000 biogas plants,China also has a large number of household biogas units. In countries like Australia and the UK,landfills are the largest source for biogas production,while they are only a minor ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you