2 Articles found
Apex Engineering Products Corporation Articles
-
Oil/carbon buildup no match for RYDALL MP case study
An industrial cleaning contractor in Iowa was looking for a way to remove heavy oil/carbon buildup on a mixer they had received from a tire manufacturing plant. Due to the severity of the buildup, a 1:1 mixture of RYDALL MP was recommended to ...
-
We`ll never rod another heat exchanger again case study
A California gas plant was experiencing heavy scale deposits in its entire plant cooling system. RYDLYME approach 6,600 gallons of RYDLYME was recommended for the 33,000-gallon system. Due to the large volume of water and low concentration of ...