3 Articles found
Cambridge Environmental Research Consultants (CERC) Articles
-
ADMS 5 Buildings Validation Lee Power Plant Wind Tunnel Study
1 Introduction The Lee Power Plant wind tunnel study1 [1] featured releases from steam boiler stacks with a common height of 64.8 m affected by a building tier with a height of 42.6 m. The world`s largest fluid modelling study chamber at Monash ...
-
ADMS 5 Buildings Validation Millstone Nuclear Power Plant
1 Introduction A series of tracer releases was carried out at the Millstone nuclear power plant1 located near Niantic on the Connecticut coast [2], Each release comprised an hour-long continuous emission of SFe from a stack at 48.3 m or of ...
-
Turbulent Fluctuations And Their Use in Estimating Compliance Standards And In Model Evaluation (PDF)
Most practical dispersion models used for regulatory purposes assume that the meteorological conditions are constant over the averaging period and calculate ensemble average concentrations. In practice, although the meteorological conditions may be ...