Waste-to-Energy plant (France) selects ENVEA for mercury monitoring and compliance with the waste incineration BREF - Case Study
The Waste-to-Energy (WtE) plant at Noidans le Ferroux (France) was commissioned in 2006 and belongs to SYTEVOM (Syndicat de Transfert, d’Elimination et de Valorisation des Déchets Ménagers) and is operated by Suez RV ...
-
Improved fluidized bed drying process and energy saving thanks to continuous moisture measurement - Case Study
Customer: Pharmaceuticals manufacturer Material: Pharmaceutical raw materials Installation point: At the bottom of the fluidized bed Function: Moisture online control
-
Improved seeds drying process and energy saving thanks to continuous moisture measurement - Case Study
Customer: Major animal feed actor Material: Sunflower seeds Installation point: Before and after the dryer Function: Moisture online control
-
Medium Combustion Plant Directive (MCPD): Monitoring of Emissions and Assessment of Compliance - Case Study
The Medium Combustion Plant Directive (MCPD) applies to over 140,000 plants in the EU, and regulates emissions from the combustion of fuels in plants with a rated thermal input between 1 and 50 MW. Part of the Clean Air Policy ...
-
ENVEA helps coal fired power plants to comply with new standards in India - Case Study
Coal combustion power plant - MIR 9000, PCME STACK 602, PicoFlow, WEX India’s Ministry of Environment, Forest and Climate Change (MoEFCC) targeted significant reduction of particulate matter (PM), sulfur oxides (SOx) and nitrogen oxides (NOx) ...
-
Flow measurement to control the exhaust gas cleaning in waste incineration - Case Study
Customer: Waste incineration plant Material: Hearth furnace coke Installation: Pneumatic conveying line, exhaust air cleaning Function: Control and dosing of the hearth furnace coke quantity for exhaust air cleaning ...
-
Waste-to-energy plant: ENVEA provides new generation of pollutants control systems - Case Study
Client: Waste-to-energy plant (France) Context: Upgrading of pollutants control systems Solution: A shelter gathering all analyzers and dioxin samplers The waste-to-energy plant in Evreux (France), which began operating in 2003, ...
-
Online flow measurement of fly ash to control process conditions - Case Study
Customer: Cement plant Material: Fly ash Installation: After hopper and screw feeder Function: Online information about the quality of flow condition APPLICATION Fly ash does have the tendency to create blockages in the cone of the hopper and ...
-
Carbon dust feed of primary firing in rotary kiln - Case Study
Client: Cement plant (Germany) Product: Coal dust Conveyed Volumes: unknown Pipe diameter: DN 100 Installation location: Supply line for primary firing of rotary kiln Number of devices: 1 According to the client, the FlowJam ...
-
Flow metering of hearth furnace coke in a waste incineration plant for the bonding of pollutants - Case Study
Client: Waste incineration plant (to generate electricity) Product: Hearth furnace coke Conveyed volumes: 10...15 kg/h Conveyor mechanism: Rotary conveyor Installation location: in the free-fall line after the rotary conveyor ...
-
Volume determination of activated coal for the bonding of pollutants in a waste-to-energy plant - Case Study
Client: Waste-to-energy plant Product: Activated coal Conveyed volumes: 2...7 kg/h Conveyor mechanism: Rotary conveyor Installation location: Free fall in a DN 50-line What measuring process was used previously: none, the ...
-
Flow metering of brown coal coke dust - Case Study
Client: Waste incinerator plant Product: brown coal coke dust
-
Flow metering of hearth furnace coke - Case Study
Customer: Waste incinerator plant Material: Hearth furnace coke
-
Solar AQMS - World`s 1st solar powered AQMS station - Case Study
Well known for its pioneering role with regards to sustainable innovation, ENVEA is the first manufacturer in the world offering tropical climate class air pollution monitors. Furthermore, as they can be 24V power ...
-
Monitoring of garbage chutes - Case Study
Application Waste recycling in incineration plants starts with the delivery and incineration of waste. The waste reaches the combustion chamber via a falling chute, which is followed by a hydraulic feed device. To guarantee a constant incineration ...
-
Coal fired power plant - humidity measurement during briquetting process - Case Study
Our subsidiary SWR Engineering has launched the M-Sens 2 sensor for the continuous measurement of humidity on solids of all kinds. It can ideally be used, for example in container outlets, conveyor belts, conveyor screws, mixers and conveyor ...