boiler tube cleaning Articles

  • Proper Valve Trim Extends Life of Boiler Feedwater Valves

    In competitive power markets, combined cycle facilities are experiencing more operating cycles than owners initially planned for at the design stage. It’s not uncommon for a combined cycle plant to experience more than 250 starts per year these days.While the ability to cycle a large combined cycle plant is ideal for fleet flexibility, frequent startups and shutdowns strain many critical ...

  • Chemically Inclined: The Case for Clean Boilers

    Boiler cleaning is something most companies don’t want to think about — if boilers are working within operational limits it’s often easier to keep up with smaller preventative maintenance (PM) tasks but put off a total chemical clean ...

  • Case study - Be modern invest in biomass boilers

    As one of the UK’s largest fireplace manufacturers and suppliers of bathroom furniture, Be Modern is an established Group of Companies based in the North East that employs over 350 skilled workers. Established in 1964 the group supplies products across the UK to a wide and diverse customer base as well as exporting products across Europe. With over 500,000 square foot of manufacturing ...


    By Mawera (UK) Ltd

  • Case study - Decorpanel opts for Mawera biomass solution

    With six Homag beam saws, CNC drilling machines, CNC routing machines and edgebanders producing around 20 tonnes in off-cuts every week, Decorpanel of Hetton-le-Hole needed a boiler that would enable the company to utilise its waste fully and provide heating for the whole site. With the existing system out of action and a factory that was heated with gas and electric, Decorpanel’s Ian Ling ...


    By Mawera (UK) Ltd

  • Care, management and maintenance of Older boilers - Case study

    Background In May 2000 Babcock & Wilcox Power Generation Group, Inc. (B&W PGG) presented a paper to the International Conference on Life Management and Life Extension of Power Plants entitled: Standard Recommendations for Pressure Part Inspection during a Boiler Life Extension Program (#BR-1701). Three years earlier, B&W PGG published a similar paper for industrial boilers ...


    By Dürr MEGTEC, LLC

  • M.V. Split Vessel Case Study

    The boiler had to be stopped for cleaning every 700-1000 hours of work, depending on the duration of the voyage. Upon arrival at ports, engine crew were busy with boiler cleaning, so they had less time for other necessary maintenance ...


    By Aerovit A/S

Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you