Project - Biomass Plant Bruneck I-IV
Already 4 biomass powered plants at Bruneck in Italy In the first phase two biomass boilers with total amount of 16MW were installed 2001. Each boiler has its own ESP for dedusting under 20mg/m3 (limit value). After ESP's the two gas streams are combined to one to be treated in one Condensation Unit. Exhaust gases are cooled down to 40°C and will be released to the chimney. ...
-
Project - Biomass Plant Bruneck I-IV
Already 4 biomass powered plants at Bruneck in Italy In the first phase two biomass boilers with total amount of 16MW were installed 2001. Each boiler has its own ESP for dedusting under 20mg/m3 (limit value). After ESP's the two gas streams are combined to one to be treated in one Condensation Unit. Exhaust gases are cooled down to 40°C and will be released to the chimney. Condensation ...
-
Project - Drying of de-inking sludge SCA Edet Mill, Lilla Edet, Sweden
This project The SCA Edet Mill produces tissue from recycled paper. When the mill in 2002 built a new biomass boiler they saw several objectives; e.g reducing oil consumption and increased power generation. Equally important was to improve the possibilities to incinerate the sludge generated in the paper recycling process and to supply district heat to the municipality. The de-inking sludge is ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you