Heat Recovery | Energy XPRT

Articles & Whitepapers

  • Bucknell University - 6 MW CHP Application - Case Study

    Bucknell University - 6 MW CHP Application - Case Study

    Quick Facts Location: Lewisburg, PA Campus Size: 450 acre campus with > 150 buildings, totaling 2.4 MM sq. ft. Student population over 3,300 Campus Loads: 42,000 MWh per yr 7.5 MW peak demand 70,000 lbs per hr steam Prime Movers: Solar Taurus 60 combustion turbine 70k lb/hr HRSG with redundancy Murray KG4 steam turbine

News

Equipment & Solutions

  • Industrial Energy & Heat Recovery Solutions
    Showcase

    Industrial Energy & Heat Recovery Solutions

    Every energy demand is unique, as is every energy-efficiency improvement opportunity. At Anguil, our track record includes an ability to blend time-tested, standard products with innovative, custom engineered solutions. We design, manufacture, and install energy recovery systems that decrease your energy consumption, reduce operating costs and maximize return on investment.