natural gas equipment Articles
-
Solvay Specialty Polymers - 8 MW CHP System - Case Study
Quick Facts LOCATION: Marietta, Ohio MARKET SECTOR: Chemical CHP GENERATING CAPACITY: 8 MW PRIME MOVER: Solar Taurus 70 gas turbine FUEL: Natural Gas HEAT RECOVERY EQUIPMENT: 150,000 lb/hr HRSG with fresh air firing capability Two 80,000 lb/hr package boilers HEAT RECOVERY RATE: Up to 150,000 lb/hr of 300 psig process steam USE OF THERMAL ENERGY: Process heating ENVIRONMENTAL CONTROLS: ...
-
University of Illinois at Chicago West Campus - 21 MW District Energy CHP System - Case Study
Quick Facts LOCATION: Chicago, Illinois MARKET SECTOR: Colleges & Universities TOTAL CHP GENERATING CAPACITY: 21 Megawatts TOTAL HEAT RECOVERY RATE: 90,000 lb/hr steam unfired 360,000 lb/hr steam duct-fired USE OF THERMAL ENERGY: Heating, Cooling, and Domestic Hot Water FUEL TYPE: Natural Gas EQUIPMENT: (3) 7.0 MW Solar Taurus Natural Gas Turbines (3) Exhaust Gas HRSGs with Duct Burners (2) ...
-
Case study - Natural gas production
OVERVIEW The largest U.S.-based independent oil and gas producer and one of the largest independent processors of natural gas and natural gas liquids in North America was in search of new technologies to maintain the pollution control efficiency at their natural gas treatment facility. In typical gas plants, the well head natural gas needs to be treated to remove water, CO2, any sulfur ...
-
North Carolina State University - 11 MW CHP & District Energy System - Case Study
Quick Facts LOCATION: Raleigh, North Carolina MARKET SECTOR: University IN OPERATION SINCE: 2012 GENERATING CAPACITY: 11 Megawatts (MW) THERMAL OUTPUT: 100,000 lbs/hour steam FUEL: Natural Gas and Distillate Fuel Oil EQUIPMENT: (2) 5.5 MW Gas Turbines (2) 50,000 lb/hr recovery boilers (2) auxiliary duct burners 750 kW Black start generator TOTAL PERFORMANCE CONTRACT: $61 Million ESTIMATED CHP ...
-
Case study - Grand Junction Sets the Pace with Colorado’s First Biogas-to-Vehicle Fuel Project at the Persigo Wastewater Plant
The first biogas-to-vehicle fuel project in Colorado converts wastewater-derived biogas mto renewable natural gas (RNG) to fuel city and county fleet vehicles Summary: The Per si go wastewater treatment plant in Grand Junction, Colorado, a city of about 60,000, processes upwards of 8.2 million gallons per day of wastewater in two anaerobic digestion tanks (primary and secondary). The facility ...
-
Evonik Industries - 5 MW Natural Gas CHP System - Case Study
Quick Facts LOCATION: Garyville, LA MARKET SECTOR: Chemical FUEL: Natural Gas GENERATING CAPACITY: 5 MW THERMAL OUTPUT: 80,000 lbs/hr Steam IN OPERATION SINCE: 2012 EQUIPMENT:(1) 5 MW Solar Turbines gas turbine (1) Cleaver Brooks D-tube HRSG USE OF ELECTRIC ENERGY: On-site & export to utility USE OF THERMAL ENERGY: Process steam INSTALLED COSTS: $10 million EMISSIONS ...
-
Industrial Maintenance for Compressor Stations
Transporting natural gas via pipelines is very safe and cost-efficient. However, in order for the transportation process to work properly it is imperative that the natural gas be kept at the correct pressure. To accomplish this compressor stations are needed at regular intervals. Let’s take a look at some key components of compressor stations as well as industrial maintenance needs. The ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you