steam turbine condenser Articles
-
Thermodynamic and thermoeconomic comparison of combined cycle cogeneration systems
In this paper, several configurations of combined cycle cogeneration systems are investigated by energy, exergy and thermoeconomic analyses. In each of these configurations, varying steam demand is considered rather than fixed steam demand. Among the different approaches for thermoeconomic analysis in the literature, the specific exergy costing method is applied. Since the systems have more than ...
-
Modelling and exergoeconomic based design optimisation of combined power plants
In this research a combined cycle power plant (CCPP) which can provide 80 MW of electrical power has been studied. The design parameters of the plant were chosen as: compressor pressure ratio, compressor isentropic efficiency, gas turbine isentropic efficiency, and turbine inlet temperature, pinch difference temperature, steam turbine inlet temperature, steam turbine isentropic efficiency, ...
-
Turbine condensers for propylene production
Propylene is one of the most important compounds in the chemical industry. It's primarily used to make the plastic polypropylene, but also in many other processes. A propylene factory in Ningbo, China set Körting Hannover AG an exceptional process-engineering challenge. It appointed the company to design special turbine condensers to produce 600,000 tonnes of propylene per year. The ...
-
Quantifying Combined Heat and Power (CHP) activity
In CHP plants without heat rejection facilities power, output is complementary to the recovery of heat, and all activity is cogeneration. CHP plants with heat rejection facilities can operate a mix of cogeneration and condensing activities. Quantifying the energy flows of both activities properly requires knowledge of the design power-to-heat ratios of the CHP processes (steam and gas turbines, ...
-
University of Texas Medical Branch - 15 MW CHP System - Case Study
Quick Facts LOCATION: Galveston, TX MARKET SECTOR: University/Hospital FACILITY SIZE: 45+ buildings, 2+ million gross square feet FACILITY PEAK LOAD: 45 MW FACILITY AVERAGE LOAD: 30 MW EQUIPMENT: East Plant: Solar Taurus 60 5.5 MW gas combustion turbine, a 2 MW condensing extraction steam turbine, heat recovery steam boiler, one 1 MW diesel engine West Plant: Solar Taurus 60 5.5 MW gas ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you