Turbine bearings | Energy XPRT
Articles & Whitepapers
-
Project - 600 KW, NY
Year: 2018 Running Gear: Three units: One vertical shaft Francis turbine with synchronous generator. One horizontal shaft turbine with synchronous generator. One horizontal shaft double-runner turbine with synchronous generator. Scope: Replacement control system, switchgear, and HPU. Black start capability. Located in a small town in the Adirondak mountains in upstate NY, this ...
-
Case Study - Aluto Langano Power Plant Rehabilitation
Aluto Langano, Ethiopia – 2007 The Aluto Langano Geothermal Pilot Plant (ALGPP) is located on the Aluto volcanic complex of the Ethiopian Rift valley, close to the eastern escarpment between ...
Equipment & Solutions
-
Showcase
Large Electric Steam Superheaters
ACME Electric Steam Superheaters are available for use with steam boilers as auxiliary pieces of equipment. Our superheaters are all custom-made and built to meet the specific design requirements of each application. A superheater increases the temperature of the steam but does not increase the latent heat of evaporation. This means that heating with superheated steam is similar to heating with ...