waste gas monitoring Articles
-
Project 16 MM SCFD Tail Gas Combustion - Case Study
Project Overview: Gas Production Facilities Jambi Merang Development Project – a Joint Operating Body (JOB) Pertamina - Hess – Talisman project. This project was an EPCI Pre-Commissioning (engineering, procurement, construction, installation and pre-commissioning) gas processing program comprising four (4) work sites with the complete conditioning of gas and liquid. The program ...
-
Rectify dry cycling of gas boilers and reduce energy costs by 25%
Building engineers, energy and facilities managers tend to overlook that many gas boilers waste energy through dry cycling when they are not actively contributing to the building heating and hot water demand. It is often thought that existing building management systems (BMS) and building energy management systems (BEMS) are optimising the boilers to remove dry cycling. However, the BMS is ...
By Vital Energi
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you