Boiler Monitoring | Energy XPRT
Articles & Whitepapers
-
Smith College Energy Center - 3.5-MW CHP Plant - Case Study
Quick Facts LOCATION: Northampton, MA FACILITY PEAK LOAD: 3.5 megawatts (MW) EQUIPMENT: 3.5 MW Solar Turbine, Rentech HRSG, package boiler and two York absorption chillers. FUEL: Natural Gas USE OF ...
News
Equipment & Solutions
-
Showcase
Temporary Boiler Tube Thermocouples
Ideal Design for “Start-Up" testing, general monitoring & other temporary measurements on Power Plant Boiler Tubes & Drum Surfaces. Simple installation: flattened tube is welded directly onto surface. Thermocouple Wire is easily routed throughout the Boiler Area. Excess wire can be coiled up or cut at the Junction Box. Standard (900ºF) & High Temperature (1300ºF) ...