Geothermal Borehole | Energy XPRT

Articles & Whitepapers

  • New Head Office and Lab Building, Riedering, Germany - Case study

    The company EndoLab - a test lab or medical implants - moved its headquarters from Thansau to Riedering near Rosenheim and built a new office and laboratory building for this new location. The task in the first planning phase was the development of a location-specific energy concept as well as climate concepts adapted to the building uses. A number of main uses are defined within the building: ...

News

Equipment & Solutions

  • Geothermal Pipe Spacer to Optimize Geothermal Borehole Energy
    Showcase

    Geothermal Pipe Spacer to Optimize Geothermal Borehole Energy

    Designed to optimize borehole energy performance, EZ-Snaps simplifies and accelerates installation compared to the other spacer models. Its main advantage lies in its capacity to receive the tremie pipe at anytime during installation, allowing the provisional withdrawal of the tremie pipe and its reintegration (when a problematic drilling requires fracture filling).