Hydropower Inspection

Articles & Whitepapers

News

  • Owner’s factory inspection for 3x8MW HPP, India

    Owner’s factory inspection for 3x8MW HPP, India

    On June 10th, the owner of 3x8MW  Hydropower plant(Installed capacity: 3x8MW ) arranged the factory inspection for excitation transformer, excitation panels, turbine & generator equipments (runner, bearing, stator coil, main shaft) before ...

Equipment & Solutions

  • Wicket Gates
    Showcase

    Wicket Gates

    Wagstaff Applied Technologies provides new and reconditioned wicket gates manufactured to customer specifications.  For reconditioned wicket gates, Wagstaff AT performs welding operations per AWS or ASME codes, using an established suite of welding procedures. Wicket Gate machining operations take place primarily on a Geminis GT-5 CNC Lathe, along with Nomura Horizontal Boring Machines. ...