West charleston hydro - Case study
In 2004, Great Bay Hydro Corporation acquired four generating facilities in Vermont, including the West Charleston Hydro plant which had been out of operation and abandoned for a number of years. The West Charleston plant was built in the early 1900s and is located on the Clyde River in the town of Charleston, Vermont. In 2010, as part of the re-permitting process and in order to meet current ...
-
Boba and Las aarias hydro - Case study
The Canal Boba and Las Barias Hydro projects were developed by the local Dominican utility with the Montreal engineering firm of Dessau Soprin. CHC provided two identical water-to-wire equipment packages, each including a 1250 mm axial flow Kaplan turbine, 900 kW/450 RPM synchronous generator hydraulic power unit and switchgear, controls and protection package. The projects were commissioned ...
-
Morgan falls hydro - Case study
The Morgan Falls Hydro plant was built in 1996 on the LaHave River near New Germany, Nova Scotia. The plant was built on the site of the abandoned pulp mill constructed by the Morgan Falls Pulp Co. in 1893. CHC provided a 1500 mm horizontal axial flow Kaplan turbine heart to the previous owner in 2000, to retrofit to the existing S type configuration. In 2017, CHC refurbished the 1500 mm runner ...
-
Mill street dam hydro - Case study
The Mill Street Dam, owned and operated by the City of Auburn, is located on the Owasco river in Auburn, New York. The generating station installed in the early 1980’s was in operation until 2004, when the costs of equipment maintenance and operational restrictions were deemed to be inefficient. The plant was shut down and remained inactive for 10 years. In 2013, the City of Auburn ...
-
Oswegatchie generating station - Case study
The Oswegatchie Hydro facility is located on the Upper Oswegatchie River in the Adirondack Mountains of Northern New York. CHC provided a water-to-wire package consisting of two 1250 mm axial flow Kaplan turbines with 1035 kW/450 RPM synchronous generators, switchgear and controls package. This redevelopment project began operations in July 2002, was constructed in only 13 months and commissioned ...
-
Glendale generating station - Case study
The Glendale hydroelectric facility is located in Stockbridge, Massachusetts. The powerhouse was built in 1900 and houses a total of five turbines, with a combined generating capacity of 1.14 MW. Back in 2006, CHC refurbished two of the existing units and provided two new main turbine shafts. In 2008, CHC replaced another of the existing units with a new 800 mm axial flow Kaplan turbine, ...
-
Lower village hydro - Case study
The Lower Village Hydro Dam was built in 1995 and is located on the Sugar River in Claremont, New Hampshire. The plant was last operational in 2011and was acquired by Sugar River Power LLC in January 2017, which owns and operates four other small hydro plants in New Hampshire and Massachusetts. As part of a major plant restoration and repowering project undertaken by the new owners, CHC is ...
-
Orono “B”/ Stillwater “B” Hydro projects - Case study
In 2011, Black Bear Hydro Partners LLC constructed two new powerhouses at the Orono and Stillwater dams, located along the Penobscot River in the State of Maine. The new plants which were commissioned in 2012 are now owned and operated by Brookfield Renewable, one of the largest hydro developers in the United States, and a long time customer of CHC. CHC provided a total of six 1700 mm axial ...
-
Tulloch 3rd unit addition - Case study
Located on the Stanislaus River in central California, the Tulloch Dam operates two vertical Francis units for a combined output of 18 MW. Commissioned in 2012, CHC provided an additional 1650 mm conventional Kaplan turbine-generator set which was added on the low level outlet of the dam, and which produces over 6.7 MW of additional power using the water that spills over the dam. The complete ...
-
Lockhart minimum flow - Case study
Lockhart Power is the owner and operator of a number of hydro projects located in South Carolina. In 2011, CHC provided two water-to-wire packages for two new Lockhart hydro sites: a 1250 mm vertical axial flow Propeller minimum flow unit with generator and controls for the Lockhart Minimum Flow project and a 1700 mm axial flow Kaplan turbine with generator and controls for the Upper Pacolet ...
-
Black river falls hydro - Case study
CHC provided a complete water-to-wire equipment package to the City of Black River Falls, Wisconsin, for the upgrade of its Black River Falls Hydroelectric Dam, located on the east bank of the Black River in Jackson County, Wisconsin. This historic dam rebuilding project was completed in June 2012, and involved the installation of an additional low-flow generating unit. The water-to-wire ...
-
Almonte Lower Falls - Case Study
Mississippi River Power Corporation Almonte, ON The Almonte Generating Station owned and operated by the Mississippi River Power Corporation is located approximately 50 kms West of Ottawa on the Mississippi River. In 2010, a new power station was built downstream from the original plant as part of the Lower Falls Redevelopment Project. The original turbines were installed as vertical open ...
-
Namewaminikan hydro development - Case study
Two new generating stations, Long Rapids and Twin Falls, located on the Namewaminikan River in Northern Ontario were commissioned in the spring of 2017. CHC provided a total of four 1850 mm axial flow Kaplan turbines with synchronous generators and hydraulic power units. The Namewaminikan hydro development has a combined output of 10 MW. The Namewaminikan hydro project was optimized to reduce ...
-
Twin falls hydro redevelopment - Case study
Commissioned in the Spring of 2016, this new 9.2 MW powerhouse, located on the Menominee River on the border of Wisconsin and Michigan, houses two vertical 2500 mm axial flow Kaplan turbines with 4600 kW / 240 rpm synchronous generators, hydraulics and unit controls provided by CHC. The new plant and spillway were built to replace the original generating station constructed in 1912, which was in ...
-
Project - 455 KW, MA
Year: 2016 Running Gear: 3 units: Vertical shaft synchronous generator driven by a Francis turbine. Vertical shaft synchronous generator driven by a propeller turbine, and a vertical shaft induction generator driven through a flat belt by a Kaplan turbine. Scope: Replacement control system, switchgear, excitation, wicket gate operators.. Located in Massachusetts, this hydroelectric plant ...
-
Curtis hydro redevelopment - Case study
The Curtis Palmer hydro facility consists of two run-of-river hydroelectric generating stations located on the Hudson River, in Corynth, NY. In 2014, CHC provided two 2250 mm vertical axial flow Kaplan open flume turbines to replace two of the five horizontal units located in the Curtis powerhouse, which were running but in poor mechanical condition. The existing generators were removed, ...
-
Project - 1.6 MW, NY
Year: 2017 Running Gear: Vertical shaft Kaplan turbine with synchronous generator. Scope: Replacement control system and exciter. Located in upstate NY, this hydroelectric plant was built in the mid-1980s in response to the federal PURPA legislation. The site is well suited to hydropower, with a small labyrinth dam spanning the river banks just above a beautiful cascade into a deep gorge. ...
-
Hydro Plant Redevelopment - Case Study
Many of our recent projects in the United States and Canada have been related to the redevelopment of abandoned structures or related to an existing plant upgrade. Shown below are a few project ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you