McLeod dam hydro - Case study
The McLeod Dam is one of six dams on the Moira River in Belleville, Ontario, Canada, owned and operated by the Quinte Conservation Association. This dam was constructed in the late 1970’s for the primary purpose of ice and flood control. In 2008, the dam was retrofitted for the secondary purpose of power generation. CHC supplied a water-to-wire equipment package consisting of two (2) ...
-
Oswegatchie generating station - Case study
The Oswegatchie Hydro facility is located on the Upper Oswegatchie River in the Adirondack Mountains of Northern New York. CHC provided a water-to-wire package consisting of two 1250 mm axial flow Kaplan turbines with 1035 kW/450 RPM synchronous generators, switchgear and controls package. This redevelopment project began operations in July 2002, was constructed in only 13 months and commissioned ...
-
Twin falls hydro redevelopment - Case study
Commissioned in the Spring of 2016, this new 9.2 MW powerhouse, located on the Menominee River on the border of Wisconsin and Michigan, houses two vertical 2500 mm axial flow Kaplan turbines with 4600 kW / 240 rpm synchronous generators, hydraulics and unit controls provided by CHC. The new plant and spillway were built to replace the original generating station constructed in 1912, which was in ...
-
Enerdu plant expansion - Case study
Located in the picturesque town of Almonte, on the North bank of the Mississippi River, the Enerdu redevelopment project involves expanding the footprint of the original powerhouse out into the river to accommodate larger turbines and to increase the plant’s generating capacity by 70%. CHC provided a water-to-wire equipment package including two 2000 mm Axial Flow Kaplan pit units with two ...
-
Orono “B”/ Stillwater “B” Hydro projects - Case study
In 2011, Black Bear Hydro Partners LLC constructed two new powerhouses at the Orono and Stillwater dams, located along the Penobscot River in the State of Maine. The new plants which were commissioned in 2012 are now owned and operated by Brookfield Renewable, one of the largest hydro developers in the United States, and a long time customer of CHC. CHC provided a total of six 1700 mm axial ...
-
Livermore Falls Hydro - Case study
Located on the Androscoggin River in Maine, the Livermore Falls hydro project required the installation of a turbine unit that would meet government minimum flow requirements on the river. CHC provided a water-to-wire equipment package which included a 1500 mm axial flow propeller turbine along with generator, hydraulic power unit, switchgear and controls to comply with the minimum flow ...
-
Lockhart minimum flow - Case study
Lockhart Power is the owner and operator of a number of hydro projects located in South Carolina. In 2011, CHC provided two water-to-wire packages for two new Lockhart hydro sites: a 1250 mm vertical axial flow Propeller minimum flow unit with generator and controls for the Lockhart Minimum Flow project and a 1700 mm axial flow Kaplan turbine with generator and controls for the Upper Pacolet ...
-
Black river falls hydro - Case study
CHC provided a complete water-to-wire equipment package to the City of Black River Falls, Wisconsin, for the upgrade of its Black River Falls Hydroelectric Dam, located on the east bank of the Black River in Jackson County, Wisconsin. This historic dam rebuilding project was completed in June 2012, and involved the installation of an additional low-flow generating unit. The water-to-wire ...
-
Higley generating station - Case study
The Higley generating station was built in 1913 and is located on the Raquette River in the State of New York. The original plant contained threeFrancis turbines producing just over 4 MW of power. In 2002, a new plant was constructed next to the existing plant, for which CHC provided four 1500 mm axial flow turbines – two propeller and two Kaplan. The existing units remained in service ...
-
Boba and Las aarias hydro - Case study
The Canal Boba and Las Barias Hydro projects were developed by the local Dominican utility with the Montreal engineering firm of Dessau Soprin. CHC provided two identical water-to-wire equipment packages, each including a 1250 mm axial flow Kaplan turbine, 900 kW/450 RPM synchronous generator hydraulic power unit and switchgear, controls and protection package. The projects were commissioned ...
-
Byron weston dam - Case study
The Byron Weston hydro plant is located on the East branch of the Housatonic River in Dalton, Massachusetts. The dam was built in 1887 and is owned by Crane & Co., the oldest paper manufacturer in North America. The hydro plant which had been decommissioned in the early 1950’s was put back in operation in 2013. CHC provided a water-to-wire equipment package including a 1250 mm axial ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you