Hydro Energy Services In Ontario
-
based in CANADA
Hydroelectric power development involves interaction with, and authorizations from, numerous government agencies. Our team helps clients by providing the following services: Project Coordination; Client Representation; Liaison with Government and Regulatory Agencies; Negotiation ...
-
Manufactured by Norcan Hydraulic Turbine Inc.based in CANADA
In a lagging world economy, we understand that financing a state-of-the-art hydro solution can be a significant hurdle for prospective developers of new hydro sites, as well as owners of existing sites. Norcan recognizes the importance of hydro-electricity to community development, and that their customers need to maximize the return on their investments. Competitive financing solutions are ...
-
based in CANADA
We provide Operations and Maintenance Services or Post-construction Services where the service required by our customers is in-line with our considerable pool of expertise. Hydroelectric generating station operations. Commissioning support. Operations planning. Maintenance ...
-
Manufactured by Renown Electric Motors & Repair Inc.based in CANADA
Keeping them operating efficiently and at their utmost capacity not only lowers yours costs, but it also eliminates downtime and equipment failures that can compromise overall system performance and ...
-
based in CANADA
Chant’s Project Development Services include the full range of skills required to identify, evaluate, plan, design, permit, construct, commission, and operate renewable energy projects and sites. Our corporate focus on the development of hydro-electric power facilities is augmented by our involvement in wind power, other renewable energy sources and traditional non-nuclear generation in ...
-
Manufactured by Greenbug Energy Inc.based in CANADA
GreenBug Energy designs our own Archimedes Screw generator systems. Systems are different for every site because they have to be designed not only for the head and flow regimes of the site but also within the limitations of the local electricity grid if grid connected. Therefore our designs stem from our R & D work but any specific site design first starts with understanding the head and flow ...
-
by BBA Incbased in CANADA
Generator owners have great interest in maximizing their power production while maintaining a high level of reliability and quality. The greatest generator performance is achieved through optimal tuning of generator controls (AVR, exciter, governor and power system stabilizer), limiters and protection. The Western Electricity Coordinating Council (WECC) developed compliance programs requiring ...
-
Manufactured by Greenbug Energy Inc.based in CANADA
GreenBug Energy makes design and manufacturing decisions that maximize IRR over the life of the project and that includes decisions that affect long term maintenance costs such as the selection of quality and durable components and materials. We then set planned maintenance schedules based on these decisions. We do the same thing whether it is our site or ...
-
based in USA
In addition to hydroelectric dams, Itasca has worked on hydroelectric power plants including a pumped storage plant in Israel (Gavet) and hydropower stations in China (Baihetan, JinPing), India, and Colombia (Guavio and Sogamoso). Engineering analyses include site characterization, review of in-situ stress measurements, ground support evaluation and recommendation, excavation stability of ...
-
Manufactured by Greenbug Energy Inc.based in CANADA
Not only does GreenBug Energy manufacture micro hydro screw generator systems but our processes are streamlined to handle mass customization because every site is different, both of which keep costs down and project viability ...
-
by BBA Incbased in CANADA
BBA has a long history with the operation and maintenance support of IPP sites ranging from co-generation facilities to wind farms and run-of-the-river hydro sites. Our team is uniquely positioned to support operating sites given our technical background as designers and engineers-of-record for these facilities combined with our field experience gained through initial testing and commissioning ...
-
based in CANADA
The ability of a power system, containing two or more synchronous machines, to continue to operate after a change occurs on the system is a measure of its stability. The stability problem takes two forms: steady-state and transient. Steady-state stability may be defined as the ability of a power system to maintain synchronism between machines within the system following relatively slow load ...
-
by BBA Incbased in CANADA
BBA's civil engineering team is composed of highly-experienced and dynamic professionals whose know-how in structure and infrastructure is recognized both in Canada and abroad. The quality of the work and projects we carry out for our clients rests on our technical capabilities, our ability to always meet client and project schedules, our innovative solutions, and the excellent communications we ...
-
based in CANADA
Energy supply and distribution has helped shaped modern society and our reliance on renewable and non-renewable energy sources will continue whether it is from centralized or de-centralized supply systems. Adverse impacts on the natural environment can occur if measures to address potential environmental effects from existing and proposed energy supply and distribution facilities are not ...
-
Manufactured by Greenbug Energy Inc.based in CANADA
There are many approvals required to install a waterpower system and those approvals are generally the same as those required for larger hydro projects which can make small hydro projects unfeasible. If the approval process is approached in the same manner as the larger projects, small projects generally just can’t absorb consulting fees for the various approvals. We therefore have ...
-
based in CANADA
Aecon Energy has a rich history of helping to harness Canada’s resources for the purposes of electricity to meet the needs of Canadians from coast to coast. From some of Canada’s first hydroelectricity dams to today’s modern nuclear facilities and emerging renewable energy projects, Aecon Energy is an integrated solutions provider to the energy sector. Our expertise spans ...
-
by ORTECHbased in CANADA
Based on extensive consultation between the Ontario Waterpower Association and its members (ORTECH was actively involved in this consultation process), the Ministry of Environment and the Ministry of Natural Resources recognized that the Renewable Energy Approval process in its original state would be poorly equipped to expedite the process for water power projects beyond what the Class EA ...
-
Manufactured by Canadian Hydro Components Ltd. (CHC)based in CANADA
CHC’s hydroelectric turbines have earned a reputation for reliability and performance.CHC has made continual improvements to its turbines and water-to-wire packages for over 30 years across its axial flow, Kaplan and Francis product lines. ...
-
based in SOUTH KOREA
The Construction BG of Doosan Heavy Industries & Construction will lead in developing high value added businesses and creating the space for enriched living based on its construction experience and technology accumulated from project worldwide in the unlimited competition of the 21st ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you