Boba and Las aarias hydro - Case study
Courtesy of Canadian Hydro Components Ltd. (CHC)
The Canal Boba and Las Barias Hydro projects were developed by the local Dominican utility with the Montreal engineering firm of Dessau Soprin. CHC provided two identical water-to-wire equipment packages, each including a 1250 mm axial flow Kaplan turbine, 900 kW/450 RPM synchronous generator hydraulic power unit and switchgear, controls and protection package.
The projects were commissioned in 2006 and 2009 respectively.
PROJECT FACTS
- Two 1250 mm Axial Flow Kaplan Turbines
- 900 kW / 450 RPM Synchronous Generators
- Switchgear, Controls and Protection Packages
- Combined Generating Capacity 1.8 MW