First Bamboo-Waste based Gasifier under construction for ITC at Mangaldai, Assam
GP Gasification plant (1800 RHT) is under construction at Mangaldai, Assam for ITC Ltd to replace oil at the rate of 300 liters per hour for biscuit baking. ITC is one of India's foremost multi-business enterprise with a market capitalization of US $ 40 billion and a turnover of US $ 8 billion. ...
-
First Bamboo-Waste based GP Gasifier successfully commissioned for ITC
GP Gasification plant ( 1800 RHT ) using bamboo-waste as its sole feedstock, has been successfully commissioned at Mangaldai, Assam for ITC. The plant is now under commercial operation. The O&M of the said plant is being done by GP Energy. ...
-
ANDRITZ and Metsä Fibre successfully perform joint program to eliminate fossil fuel use in lime kiln at Joutseno mill, Finland
NDRITZ and Metsä Fibre have successfully collaborated on a program to maximize reduction of the use of fossil fuels, as well as improve the overall performance of the lime kiln at the Joutseno mill in Finland. The goal of the program, entitled “Gasification Plant 100% Utilization Rate”, was to maximize the availability of all equipment, including the wood processing plant, dryer, ...
By Andritz AG
-
Gasification plant to join London sustainable industries park
A 100,000 tonne a year gasification plant is set to join Close Loop Recycling’s plastics facility on the Government-backed Thames Gateway recycling park. Government agency, the London Thames Gateway Development Corporation, announced a deal with waste company Cyclamax to build a gasification plant at the 25 hectare Sustainable Industries Park in Dagenham, east London. The facility will process ...
-
First DFB Gasification Plant in Thailand starts commercial operation
The first DFB gasification plant at Nongbua Thailand, entirely designed and manufactured by GP Energy has started commercial operation from 16th Jan 2019. The formal inauguration was marked by ceremonial event in the preasense of H.E the Austrian Ambassador to Thailand, Dr. Eva Hager, H.E. the Cuban Ambassador to Thailand, Mr. Lázaro Herrera Martínez , Maj. Gen. Pairush ...
-
Newport grants Biogen gasification plant planning permission
A new gasification plant is set to be built in Newport, south Wales, after planning permission was granted to BioGen Power. The facility will have the capacity to process 120,000 tonnes of waste and will generate 12 MWe of electricity. BioGen Power will work with Energos to provide the technology for the plant. BioGen Power chief executive Christian Reeve said: “This is a highly suitable location ...
-
Opposition to Lisburn energy from waste gasification plant
A proposed energy from waste gasification plant has prompted strong opposition from both residents and members of the council in Lisburn, Northern Ireland. A planning application to build the plant on the site of a former burn house on the Moira Road was lodged by Lisburn Energy Recovery but since then has faced criticism, with one councillor calling for a formal opposition to the proposal. ...
-
Energos gets green light to build gasification plant in Doncaster
Energy technology business Energos has received planning permission from Doncaster Metropolitan Borough Council to build a gasification plant. The £75 million partnership with renewable energy company BioGen Power will provide a community-sized facility to handle Doncaster’s local waste – diverting it from landfill. Over the past three years, six planning applications based on the Energos ...
-
Metso-supplied world´s largest biomass gasification plant inaugurated in Finland
Vaskiluodon Voima Oy has inaugurated the world's largest biomass gasification plant, which was supplied by Metso, in Vaasa, Finland. The plant was inaugurated by the Finnish Minister of Labour Lauri Ihalainen on March 11th. Vaskiluodon Voima's plant is ground-breaking in many ways, as this is the first time in the world that biomass gasification is being adopted on such a large scale for ...
-
Waste board gives £12m to gasification plant
The London Waste and Recycling Board has announced that it will give £12 million of guarantee funding to a gasification plant proposed for a site in Dagenham, east London. The plant, run by London-based technology firm Biossence, will process 100,000 tonnes of the capital’s waste and turn it into electricity. The plant will be situated on the site of local Ford factory in Dagenham. It is ...
-
Planning permission approval for Doncaster gasification plant
BioGen Power, with help from environmental consultants SLR Consulting, has secured planning permission for a new gasification plant in Doncaster. The facility will have a 120,000 tonne capacity which will generate 9.4 MW of electricity annually – enough to power 20,000 homes. SLR Consulting assisted BioGen in preparing the environmental impact assessment. Renewable energy firm BioGen Power’s ...
-
BioGen Power to build world`s largest residual waste gasification plant
BioGen Power has received planning permission to build the world’s largest waste gasification facility to be fuelled by residual waste in Bradford, West Yorkshire. The facility will process 160,000 tonnes of residual waste each year, generating 83,300 MWe of electricity. Energos, owned by Manchester-based energy solution provider Ener-G, will supply the gasification technology. BioGen Power ...
-
Largest Gasification Plant in the world nears completion
Dubbed the “largest gasification plant in the world”, construction work is nearly done on Air Products’ second 50 MW plasma gasification waste to energy facility on Teesside, North East England. While a number of major projects are underway globally, waste gasification has a chequered past. Many argue that when traditional thermal treatment with heat recovery is able to achieve ...
-
Largest Gasification Plant in the World nears Completion
While a number of major projects are underway globally, waste gasification has a chequered past. Many argue that when traditional thermal treatment with heat recovery is able to achieve such high efficiencies, gasification is complex and unnecessary. Others point to low emissions and the potential to produce products such as hydrogen. Air Products is due to begin processing 350,000 tonnes of RDF ...
-
Energos due to open GBP 8m gasification plant
Energy technology business Energos is due to open its GBP 8 million Isle of Wight gasification plant in the middle of November. Energos claims that the plant will be a UK first for using advanced thermal conversion technology in the gasification process. The facility is part of the Department for Environment, Food and Rural Affairs New Technology Demonstrator Programme, which aims to ...
-
Metso to deliver world`s largest biomass gasification plant to Vaskiluodon Voima in Vaasa
The investment enables the replacement of coal with domestic wood-based renewable fuels and reduces carbon dioxide emissions Metso Corporation's press release on June 8, 2011 at 09:00 a.m. local time Metso will supply Vaskiluodon Voima Oy in Vaasa, Finland, with a 140-megawatt bio-gasification plant. Vaskiluodon Voima's total investment is about 40 million euros, over half of which is ...
-
Metso to deliver gasification technology for renewable gas production to Göteborg Energi AB, Sweden
Metso Corporation's press release on February 8, 2011 at 11:00 a.m. local time Metso will supply a gasifier to sustain new gasification technology to Göteborg Energi AB's innovative project GoBiGas20MW. The value of the order is approximately EUR 30 million, and the order was already included in Energy and Environmental Technology's Q4/2010 orders received. The gasification demo plant will be ...
-
Montana Governor Signs Clean Energy Bills
HELENA, Montana (ENS) – Montana Governor Brian Schweitzer Tuesday signed into law two bills that provide tax incentives for future development and transmission of clean and renewable energy. The incentives support the development of new transmission lines, carbon dioxide sequestration pipelines to prevent emission of this greenhouse gas into the atmosphere, liquid fuel pipelines, power plants, ...
-
Surrey County Council drops incinerator plans
Surrey County Council has axed plans to build two energy from waste plants after improved waste and recycling rates meant there was no need for such big facilities. In their place, a gasification plant and anaerobic digestion plant will be built to handle 100,000 tonnes of waste each year, instead of the 270,000 tonne capacity the incinerators offered. Leader of the council Dr Andrew Povey ...
-
TAIM WESER to unveil high-efficiency biomass gasification plant
TAIM WESER will unveil its latest biomass gasification plant at Expobionergía 09. This is an innovative green cogeneration system that the company has developed and marketed itself. The high-energy efficiency plant uses biomass to produce electricity and heat. Due to its compact size and modular design it can be installed wherever the biomass product is created. The fourth Expobioenergía 09 is ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you